INSP-Final Inspection | 3/27/2013 | 3/28/2013 | 3/28/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Sprinkler Rough-in/Hydro | 3/26/2013 | 3/27/2013 | 3/27/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler system modifications passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 3/19/2013 | 3/22/2013 | 3/22/2013 | A | DEFR |
Forrest France
|
|
|
Brian will be on site call prior to arrival Phone #: ###-#### >> Inspection requested via web by Sam Ball
|
FIR-Aging Inspection | 2/7/2013 | 2/7/2013 | 2/7/2013 | P | DONE |
Forrest France
|
|
|
Work in progress per contractor
|
FIR-Aging Inspection | 1/17/2013 | 1/17/2013 | 1/18/2013 | | DONE |
Forrest France
|
|
|
wip
|
FIR-Aging Inspection | 10/17/2012 | 10/17/2012 | 10/17/2012 | | DONE |
Forrest France
|
|
|
In progress
|
FIR-Aging Inspection | 7/18/2012 | 7/18/2012 | 7/18/2012 | A | CANC |
Forrest France
|
|
|
Contact Phone #: ###-#### Inspection cancelled from web by: Sam Ball
|