Permit Information
Permit NumberFIR12-00161
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 13626 W BALDCYPRESS ST
Project NameTRADITIONS of Boise
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of providing protection per NFPA 13R for a (4) level structure. The structure is technically (3) buildings. There is a class I combined manual wet standpipe throughout the structure. The building(s) are divided by horizontal exits. Residential sprinklers are used throughout except for areas outside of the dwelling units and corridors. The top level has piping tented lying on the trusses.
Ammended 06-07-12 The fire protection underground of 6"x150+- C-900 with necessary thrust blocks, fittings and restraints are included in this permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/21/20128/21/20128/21/2012PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection6/20/20126/21/20126/21/2012AFAIL
DetailsTroy Cobbley
Inspection turned into a conference. Tom and I walked the project and discussed the obstructions to the pendant sprinkler heads. Some heads have been relocated but other are still blocked by the light fixtures. There is also an issue with esch. on some of the dry sidewalls due to the rock facing not allowing the installation of the canopies.
INSP-Final Inspection6/19/20126/19/20126/19/2012PFAIL
DetailsTroy Cobbley
Todays inspection was for a building walk through. I found pendant heads blocked by lights in the third floor library. Pendant head bent in room 317. Pendants covered in rooms 328 and 316 and in the corridor closet outside of room 314. Three pendant heads are also covered in the area "A" south third floor corridor. The sidewall heads in the fourth floor exterior common balcony are located with the deflectors at 2 1/2" to 3" below the ceiling. Need verification they are listed for this. The first and second floors east of the fire wall has not been inspected yet since the light fixtures have not been installed yet. I did note that some of the corridor pendants in the two room apartments are located close to electrical boxes so if lights are installed obstruction may be present. Also washer and dryers are being installed in many of the closets in the residence rooms. The sprinkler pendants in these rooms are 155 degree which may not be high enough temperature. Tom, the project fitter, and I discussed it and he was going to talk to his office.
INSP-Final Inspection6/12/20126/13/20126/13/2012APART
DetailsTroy Cobbley
Fire sprinkler work is complete for the first and second floors of areas "A " and "B".
INSP-Final Inspection6/11/20126/12/20126/12/2012PCANC
DetailsTroy Cobbley
Canceled per onsite conversation with the project superintendant for Inland Construction. Touch-up work is not yet complete and heads are still covered and missing cover plates.
INSP-Final Inspection6/11/20126/11/20126/12/2012PFAIL
DetailsTroy Cobbley
Todays inspection I walked through areas A and B, all of the second floor and the west half of the first floor. I found many rooms where the sprinkler heads are covered due to touch up work by painters. I gave a list of room numbers with the covered heads to the job superintendant.
INSP-Final Inspection6/7/20126/8/20126/8/2012PFAIL
DetailsTroy Cobbley
Todays inspection was for the riser room tamper and flow switches as well as the tamper and flow switches for the west stair well floor control assemblies. The standpipe tamper switches were tested as well except for the east tamper which has not been connected to the fire alarm sytem yet. Forward flush passed. Flow switch delay was adjusted while I waited for most flow switches. A sticker is needed for the outside alarm bell.
INSP-Final Inspection6/5/20126/7/20126/7/2012PCANC
DetailsTroy Cobbley
To be canceled per Tom.
INSP-Sprinkler Rough-in/Hydro4/30/20124/30/20124/30/2012PPASS
DetailsTroy Cobbley
The standpipe hydro test passed.
INSP-Sprinkler Rough-in/Hydro4/27/20124/27/20124/27/2012PFAIL
DetailsTroy Cobbley
The hydro test for the standpipe failed due to a visible pressure loss on four of five pressure guages.
INSP-Sprinkler Rough-in/Hydro4/25/20124/26/20124/26/2012PCANC
DetailsTroy Cobbley
Hydro test cancelled due to time constraints.
INSP-Sprinkler Rough-in/Hydro4/25/20124/25/20124/25/2012PFAIL
DetailsTroy Cobbley
The standpipe hydro test failed due to a visible 2psi loss on five different guages/locations on the standpipe system.
INSP-Sprinkler Rough-in/Hydro4/24/20124/25/20124/25/2012AFAIL
DetailsTroy Cobbley
Hydro test for the standpipe system failed due to a fitter draining the system as I documenting pressure on the fourth floor guages.
INSP-Sprinkler Rough-in/Hydro4/20/20124/23/20124/23/2012APASS
DetailsTroy Cobbley
The overhead hydro test for the pendant sprinkler piping has passed. The standpipe piping has not been hydro tested yet. The east wing corridor sprinkler piping can be covered.
INSP-Sprinkler Rough-in4/11/20124/12/20124/12/2012PPASS
DetailsTroy Cobbley
See the city approved plans for additional areas where the sprinkler piping can be covered. Per fire sprinkler plan reviewer (Tim Frost) the sprinkler heads in the garbage chute at the fourth and second floors are OK. I noted over spaced heads in the first floor electrical room and a missing 4" control valve in the east side standpipe.
INSP-Sprinkler Rough-in4/10/20124/11/20124/11/2012PPASS
DetailsTroy Cobbley
See the city approved plans for locations on the first, second and fourth floor where the sprinkler piping can be covered.
INSP-Sprinkler Rough-in4/5/20124/6/20124/9/2012PDEFR
DetailsForrest France
INSP-Sprinkler Rough-in4/6/20124/9/20124/9/2012PPASS
DetailsTroy Cobbley
See the city approved plans for the locations of rooms where sprinkler piping cna be covered. Several issues that need corrected are marked on the plans.