INSP-Final Inspection | 7/11/2012 | 7/11/2012 | 7/11/2012 | P | PASS |
Forrest France
|
|
|
Scope of permit work passed final walkthrough. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 5/21/2012 | 5/21/2012 | 5/21/2012 | A | PART |
Forrest France
|
|
|
Correction items verified for completion. Rough-in passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/11/2012 | 5/11/2012 | 5/11/2012 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/9/2012 | 5/10/2012 | 5/10/2012 | A | PART |
Forrest France
|
|
|
C/N items include one overspaced head at bedroom 13, missing hangers on the 1 1/4" system tie in at bedroom 12, noted possible light fixture obstructions at bedrooms 8 and 9 due to proximity of pendent heads and LF J-boxes.
|
INSP-Sprinkler Rough-in | 5/9/2012 | 5/10/2012 | 5/9/2012 | P | CANC |
Forrest France
|
|
|
Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
|
INSP-Sprinkler Rough-in | 4/27/2012 | 4/27/2012 | 4/27/2012 | P | NR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 4/26/2012 | 4/26/2012 | 4/26/2012 | P | FAIL |
Troy Cobbley
|
|
|
After searching the job site, the city approved plans could not be found. No inspection was performed.
|