Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR12-00276
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 7000 W STATE ST
Project NameGoodwill Easter Seal
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of adding, relocating and plugging sprinklers to accommodate new wall and ceiling configuration. The existing hydraulic calculations for remote area 5 were .20/1592+250 the demand was 683.6 Gpm@58.4 Psi. The original flow information was S-70, R-20, Q-2750 & D-09/27/2004. The current water supply is S-80, R-20, Q-2750 & D-05/07/2012. Since the occupancy is still Ordinary Hazard II and the flow information is slightly better, new hydraulic calculations were deemed not necessary.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/7/20128/7/20128/7/2012PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection8/6/20128/7/20128/7/2012AFAIL
DetailsTroy Cobbley
Can't final until all of the ceiling tile has been installed.
INSP-Final Inspection7/21/20127/24/20127/24/2012PFAIL
DetailsTroy Cobbley
Permit can be finaled when the ceiling tile has been installed. Interconnection of sprinkler devices with the facp tested except for the south canopy tamper switch that was not shown on the fire alarm plans.
INSP-Sprinkler Rough-in/Hydro7/18/20127/19/20127/19/2012APASS
DetailsTroy Cobbley
Hydro test passed
INSP-Sprinkler Rough-in/Hydro7/17/20127/18/20127/18/2012APASS
DetailsTroy Cobbley
Sprinkler piping can be covered. A hydro test is required prior to a final sign off.
INSP-Sprinkler Rough-in6/27/20126/27/20126/27/2012PPASS
DetailsTroy Cobbley
The sprinkler piping for the new head outside of the "cash room" is ok to cover.
INSP-Sprinkler Rough-in/Hydro6/25/20126/25/20126/25/2012PPART
DetailsForrest France
Okay to cover overhead work at the mens and womens restroom including the entry vestibule and two pendent heads to the west of the new partition wall. See plan set for marked and dated areas.