INSP-Final Inspection | 8/17/2012 | 8/20/2012 | 8/20/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2012 | 8/20/2012 | 8/20/2012 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test at system pressure completed.
|
INSP-Final Inspection | 8/14/2012 | 8/16/2012 | 8/16/2012 | P | FAIL |
Troy Cobbley
|
|
|
Several ceiling tiles are missing, ceiling is missing from Storage 128 and a hydro test is required per the review comments. Head spacing and sprinkler type appears ok.
|
INSP-Sprinkler Rough-in | 7/16/2012 | 7/17/2012 | 7/17/2012 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was for the arm-overs at the roof deck and the drops. An additional inspection will be required for the actual pendant head installation prior to the installation of the ceilings.
|