INSP-Final Inspection | 3/5/2013 | 3/6/2013 | 3/6/2013 | A | PASS |
Forrest France
|
|
|
Previous inspection items okayed, recieved record of completion documents. Fire alarm permit finaled.
|
INSP-Final Inspection | 12/28/2012 | 12/28/2012 | 12/28/2012 | P | FAIL |
Troy Cobbley
|
|
|
Will be able to final when the call list has been set up and the NFPA 72 are complete.
|
INSP-Final Inspection | 12/26/2012 | 12/27/2012 | 12/27/2012 | A | FAIL |
Troy Cobbley
|
|
|
Signals were not received correctly at the monitoring station. Need NFPA 72 record of completion forms. Need as-builts that match the actual installation.
|
INSP-Final Inspection | 12/18/2012 | 12/19/2012 | 12/19/2012 | A | FAIL |
Troy Cobbley
|
|
|
No city approved drawings on site for review. I noted that the horn/strobes are overspaced. Also missing the breaker locks. The project related FIR permit for the AES could not be finaled due to lack of required Netcon.
|
FIR-Aging Inspection | 11/19/2012 | 11/19/2012 | 11/20/2012 | | DEFR |
Troy Cobbley
|
|
|
Need site inspection request
|