INSP-Final Inspection | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled.
|
INSP-Final Inspection | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
FIR-Aging Inspection | 4/26/2013 | 4/26/2013 | 4/26/2013 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
INSP-Sprinkler Rough-in | 8/1/2012 | 8/2/2012 | 8/2/2012 | A | PASS |
Troy Cobbley
|
|
|
Underground rough inspection - 5 feet from building is ok to cover. City approved plans have been marked for location and dated.
|
INSP-Sprinkler Rough-in | 7/26/2012 | 7/27/2012 | 7/27/2012 | A | PASS |
Troy Cobbley
|
|
|
Undergound rough to cover approved for additional supply piping. See the city approved plans for location highlighted in red with todays date.
|
INSP-Sprinkler Rough-in | 7/25/2012 | 7/26/2012 | 7/26/2012 | P | CANC |
Forrest France
|
|
|
Underground Rough to Cover Inspection - Joe Snyder is the contact at ###-#### Phone #: ###-#### >> Inspection requested via web by Kindel de Leon Inspection cancelled from web by: Kindel de Leon
|
INSP-Sprinkler Rough-in | 7/20/2012 | 7/20/2012 | 7/20/2012 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping ok to cover as marked on the city approved plans with todays date.
|
INSP-Sprinkler Rough-in | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | FAIL |
Troy Cobbley
|
|
|
Underground Inspection failed due to no approved plans on site and I noted that the underground supply piping only has 3'-10" of cover which does not meet the minimum 4'-6" requirement.
|