INSP-Final Inspection | 10/26/2012 | 10/26/2012 | 10/26/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/19/2012 | 10/24/2012 | 10/24/2012 | A | FAIL |
Troy Cobbley
|
|
|
Fees due hold on project. I did not know this until I arrived at the project. Since this was set up previously for an after hours inspection, and I was already there at 5am, I went ahead and performed inspection. Permit can be finaled when the fees are taken care of at the permit desk.
|
INSP-Alarm Testing | 10/16/2012 | 10/19/2012 | 10/19/2012 | A | FAIL |
Troy Cobbley
|
|
|
See todays entry
|
INSP-Alarm Testing | 10/16/2012 | 10/19/2012 | 10/19/2012 | A | FAIL |
Troy Cobbley
|
|
|
See todays entry
|
INSP-Final Inspection | 10/18/2012 | 10/19/2012 | 10/19/2012 | A | FAIL |
Troy Cobbley
|
|
|
This was an early morning after hours inspection. No testing was actually performed due to most of the strobes were overspaced/wrong candella. By the time the changes were made we were outside the window of testing. Rita was contacted for overtime billing.
|
INSP-Alarm Testing | 10/15/2012 | 10/17/2012 | 10/16/2012 | A | CANC |
Troy Cobbley
|
|
|
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by Brian Anderson Inspection cancelled via mobile web on Tuesday, October 16, 2012.
|