INSP-Final Inspection | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Pendant heads cut back and changed to quick responce.
|
INSP-Final Inspection | 8/14/2012 | 8/15/2012 | 8/15/2012 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is given until the two heads are changed to quick responce.
|
INSP-Final Inspection | 8/13/2012 | 8/14/2012 | 8/14/2012 | A | FAIL |
Troy Cobbley
|
|
|
Need the ceiling tile installed and the new gazebo address per discussion.
|
INSP-Sprinkler Rough-in | 8/13/2012 | 8/14/2012 | 8/14/2012 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping can be covered.
|
INSP-Final Inspection | 8/13/2012 | 8/14/2012 | 8/13/2012 | P | CANC |
Troy Cobbley
|
|
|
Jeff is contact Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes
|
INSP-Sprinkler Rough-in | 7/31/2012 | 7/31/2012 | 7/31/2012 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler line in the soffit can be covered.
|
INSP-Sprinkler Rough-in | 7/26/2012 | 7/27/2012 | 7/27/2012 | A | PASS |
Troy Cobbley
|
|
|
Hardlids are ok to cover.
|