INSP-Final Inspection | 5/16/2013 | 5/17/2013 | 5/17/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 5/8/2013 | 5/8/2013 | 5/8/2013 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
INSP-Sprinkler Rough-in | 1/31/2013 | 2/1/2013 | 2/1/2013 | A | PART |
Forrest France
|
|
|
Tenting inspection completed satisfactory, okay to cover overhead work at the second floor.
|
INSP-Sprinkler Rough-in | 1/28/2013 | 1/28/2013 | 1/28/2013 | A | PART |
Troy Cobbley
|
|
|
Rough-in pretty much matches the city approved plans except for there are three addtional 1" elbows in the remote area branchline. Verification needs to be provided to plan review that this does not adversly effect the calcs. Also no city approved review comments or data sheets were with the plans and will need to be provided prior to a final sign off. I let the builder know he could cover but its at his own risk.
|