INSP-Final Inspection | 11/27/2013 | 12/2/2013 | 12/3/2013 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Final Inspection | 11/27/2013 | 11/29/2013 | 11/27/2013 | A | CANC |
Forrest France
|
|
|
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 11/19/2013 | 11/22/2013 | 11/26/2013 | A | NR |
Forrest France
|
|
|
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 7/26/2013 | 7/29/2013 | 7/29/2013 | A | PASS |
Troy Cobbley
|
|
|
The flush of both underground supply lines passed.
|
INSP-Supply line flush | 7/23/2013 | 7/25/2013 | 7/25/2013 | A | NR |
Forrest France
|
|
|
UG Flush-we would like to request this for 7:00 am, Mike Bierman is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 7/23/2013 | 7/23/2013 | 7/25/2013 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test completed
|
INSP-Sprinkler Rough-in | 7/17/2013 | 7/18/2013 | 7/18/2013 | A | DONE |
Tim Frost
|
|
|
Rough in passed. There was no flushing at this time.
|
INSP-Sprinkler Rough-in | 7/17/2013 | 7/17/2013 | 7/17/2013 | P | PART |
Tim Frost
|
|
|
One main was roughed in. Two addtional ells were added. The flange still needs to be rodded to the wall. Everthing else appeared ok.
This is an ug inspection. Stan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR-Aging Inspection | 6/28/2013 | 6/28/2013 | 6/28/2013 | | DONE |
Forrest France
|
|
|
Site work in progress
|
FIR-Aging Inspection | 3/5/2013 | 3/5/2013 | 3/5/2013 | | DONE |
Forrest France
|
|
|
Site work in progress, construction underway.
|