Permit Information
Permit NumberFIR12-00717
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1055 N CURTIS RD
Project NameSARMC - ED RENOVATION / EXPANS
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

The installation will be divided into three phases. Impairment procedures are noted on the phases plan FP3.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in8/11/20148/11/20148/11/2014PPASS
DetailsTroy Cobbley
Two small rooms, as marked on the plans, at the new canopy, are of for cover.
INSP-Final Inspection6/30/20147/1/20147/1/2014APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection6/16/20146/17/20146/17/2014APART
DetailsForrest France
Completed inspection for cover at several areas as marked/dated on approved plans including; physician lounge 18102, utility/clean linen 18100, open work area, 13 exam rooms 18130, enviromental supply, corridor, soiled utiltiy, and family consult rooms 18105-108.
INSP-Sprinkler Rough-in6/3/20146/3/20146/3/2014PPART
DetailsForrest France
Fire sprinkler install okay for cover at janitors closet 18116 and ISO RR 18115. Plans initialed and dated.
INSP-Sprinkler Rough-in5/29/20145/29/20145/29/2014PPASS
DetailsTroy Cobbley
See the city approved plans for additional arears where piping can be covered.
INSP-Final Inspection5/13/20145/14/20145/14/2014APART
DetailsTroy Cobbley
Sprinkler work is complete for trauma and temporary corridor in ER area
INSP-Sprinkler Rough-in5/12/20145/12/20145/13/2014PPASS
DetailsTroy Cobbley
See the city approved plans for additional areas where piping is ok to cover.
INSP-Final Inspection5/9/20145/9/20145/9/2014PFAIL
DetailsTroy Cobbley
Not ready for a final inspection. This was a rough-in inspection. See the city approve plans for locations marked "ok" where piping can be covered.
INSP-Sprinkler Rough-in4/29/20144/29/20144/29/2014PPASS
DetailsTroy Cobbley
See the city approved plans for locations where tile can be installed.
INSP-Sprinkler Rough-in4/10/20144/11/20144/11/2014APASS
DetailsTroy Cobbley
See the city approved plans for locations marked "ok" where piping is ok to cover.
INSP-Sprinkler Rough-in4/3/20144/3/20144/3/2014PPASS
DetailsTroy Cobbley
John Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro4/3/20144/3/20144/3/2014PPASS
DetailsTroy Cobbley
Hydro test passed
INSP-Sprinkler Rough-in/Hydro3/10/20143/10/20143/11/2014PPART
DetailsTroy Cobbley
phase 3 main and branchline rough-in passed. Will still need rough-in inspection for the drops
INSP-Final Inspection12/24/201312/26/201312/30/2013APART
DetailsTroy Cobbley
for phase 2B and staff lounge
INSP-Final Inspection12/26/201312/27/201312/27/2013APART
DetailsTroy Cobbley
Fire sprinklers complete in 2B and Staff Lounge.
INSP-Sprinkler Rough-in12/18/201312/19/201312/19/2013APASS
DetailsTroy Cobbley
See the city approved plans for locations with todays date where sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in11/5/201311/6/201311/6/2013APASS
DetailsTroy Cobbley
See the city approved plans for location dated with todays date where sprinkler piping is ok to cover. Also the north east portion of the new gridded system passed hydro test.
INSP-Sprinkler Rough-in10/28/201310/29/201310/29/2013APASS
DetailsTroy Cobbley
Piping above the restrooms can be covered.
INSP-Final Inspection9/9/20139/10/20139/11/2013APART
DetailsForrest France
Okayed fire sprinkler work at phase 2A only.
INSP-Sprinkler Rough-in8/22/20138/22/20138/22/2013PPASS
DetailsTroy Cobbley
See the city approved plans for locations in the Emergency Room where piping can be covered.
INSP-Sprinkler Rough-in7/16/20137/16/20137/16/2013PPASS
DetailsTroy Cobbley
The piping in the exam room restroom is ok to cover.
INSP-Sprinkler Rough-in/Hydro7/10/20137/11/20137/11/2013APASS
DetailsTroy Cobbley
OH hydro for area 2a passed
INSP-Sprinkler Rough-in7/2/20137/3/20137/3/2013APASS
DetailsTroy Cobbley
See the city approved plans for areas where the sprinkler rough-in passed.
INSP-Sprinkler Rough-in4/1/20134/2/20134/2/2013APASS
DetailsTroy Cobbley
See the city approved plans for location where the sprinkler piping can be covered