INSP-Sprinkler Rough-in | 8/11/2014 | 8/11/2014 | 8/11/2014 | P | PASS |
Troy Cobbley
|
|
|
Two small rooms, as marked on the plans, at the new canopy, are of for cover.
|
INSP-Final Inspection | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | PART |
Forrest France
|
|
|
Completed inspection for cover at several areas as marked/dated on approved plans including; physician lounge 18102, utility/clean linen 18100, open work area, 13 exam rooms 18130, enviromental supply, corridor, soiled utiltiy, and family consult rooms 18105-108.
|
INSP-Sprinkler Rough-in | 6/3/2014 | 6/3/2014 | 6/3/2014 | P | PART |
Forrest France
|
|
|
Fire sprinkler install okay for cover at janitors closet 18116 and ISO RR 18115. Plans initialed and dated.
|
INSP-Sprinkler Rough-in | 5/29/2014 | 5/29/2014 | 5/29/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional arears where piping can be covered.
|
INSP-Final Inspection | 5/13/2014 | 5/14/2014 | 5/14/2014 | A | PART |
Troy Cobbley
|
|
|
Sprinkler work is complete for trauma and temporary corridor in ER area
|
INSP-Sprinkler Rough-in | 5/12/2014 | 5/12/2014 | 5/13/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional areas where piping is ok to cover.
|
INSP-Final Inspection | 5/9/2014 | 5/9/2014 | 5/9/2014 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for a final inspection. This was a rough-in inspection. See the city approve plans for locations marked "ok" where piping can be covered.
|
INSP-Sprinkler Rough-in | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where tile can be installed.
|
INSP-Sprinkler Rough-in | 4/10/2014 | 4/11/2014 | 4/11/2014 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations marked "ok" where piping is ok to cover.
|
INSP-Sprinkler Rough-in | 4/3/2014 | 4/3/2014 | 4/3/2014 | P | PASS |
Troy Cobbley
|
|
|
John Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 4/3/2014 | 4/3/2014 | 4/3/2014 | P | PASS |
Troy Cobbley
|
|
|
Hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 3/10/2014 | 3/10/2014 | 3/11/2014 | P | PART |
Troy Cobbley
|
|
|
phase 3 main and branchline rough-in passed. Will still need rough-in inspection for the drops
|
INSP-Final Inspection | 12/24/2013 | 12/26/2013 | 12/30/2013 | A | PART |
Troy Cobbley
|
|
|
for phase 2B and staff lounge
|
INSP-Final Inspection | 12/26/2013 | 12/27/2013 | 12/27/2013 | A | PART |
Troy Cobbley
|
|
|
Fire sprinklers complete in 2B and Staff Lounge.
|
INSP-Sprinkler Rough-in | 12/18/2013 | 12/19/2013 | 12/19/2013 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations with todays date where sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for location dated with todays date where sprinkler piping is ok to cover. Also the north east portion of the new gridded system passed hydro test.
|
INSP-Sprinkler Rough-in | 10/28/2013 | 10/29/2013 | 10/29/2013 | A | PASS |
Troy Cobbley
|
|
|
Piping above the restrooms can be covered.
|
INSP-Final Inspection | 9/9/2013 | 9/10/2013 | 9/11/2013 | A | PART |
Forrest France
|
|
|
Okayed fire sprinkler work at phase 2A only.
|
INSP-Sprinkler Rough-in | 8/22/2013 | 8/22/2013 | 8/22/2013 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations in the Emergency Room where piping can be covered.
|
INSP-Sprinkler Rough-in | 7/16/2013 | 7/16/2013 | 7/16/2013 | P | PASS |
Troy Cobbley
|
|
|
The piping in the exam room restroom is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/10/2013 | 7/11/2013 | 7/11/2013 | A | PASS |
Troy Cobbley
|
|
|
OH hydro for area 2a passed
|
INSP-Sprinkler Rough-in | 7/2/2013 | 7/3/2013 | 7/3/2013 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas where the sprinkler rough-in passed.
|
INSP-Sprinkler Rough-in | 4/1/2013 | 4/2/2013 | 4/2/2013 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for location where the sprinkler piping can be covered
|