INSP-Final Inspection | 2/14/2013 | 2/14/2013 | 2/14/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 2/5/2013 | 2/6/2013 | 2/5/2013 | A | CANC |
Troy Cobbley
|
|
|
Don Weland is the contact at ###-#### Phone #: ###-#### >> Inspection requested via web by Kindel de Leon Inspection cancelled from web by: Kindel de Leon
|
INSP-Sprinkler Rough-in | 2/5/2013 | 2/5/2013 | 2/5/2013 | P | PASS |
Troy Cobbley
|
|
|
Piping is ok to cover. Sheet rock will be verified at final.
|
INSP-Sprinkler Rough-in | 2/4/2013 | 2/4/2013 | 2/4/2013 | P | FAIL |
Troy Cobbley
|
|
|
Upright sprinkler has been added per agreement but the outside of the room has not been sheet rocked. Also additional wood has been added by this same room in the unprotected space.
|
INSP-Final Inspection | 1/28/2013 | 1/29/2013 | 1/29/2013 | A | FAIL |
Troy Cobbley
|
|
|
Project needed a rough to cover not a final inspection. One pendant as shown on the plans to be relocated did not get relocated as required. Also the new walls are wood which creates a problem with combustibles in a concealed space. Don and I talked about a couple of different options.
|
INSP-Final Inspection | 1/28/2013 | 1/28/2013 | 1/28/2013 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints.
|