Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR13-00068
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2588 N BOGUS BASIN RD
Project NamePursuit Church T.I.
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

Since this is a change of occupancy to light hazard, ALL sprinklers are required to be quick response type regardless if they are shown in the scope of work.

Plan Mod #1 – 5/17/2013
Changes due to field conditions. New ceiling have been added.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/3/20136/4/20136/4/2013PPASS
DetailsForrest France
Remainder of correction items verified for completion, final walkthrough passed. Fire sprinkler permit finaled.
INSP-Final Inspection5/30/20136/3/20136/3/2013APART
DetailsForrest France
Walkthrough completed, final pending coverage adjustments at the "green room" due to surface mounted obstructions.
INSP-Final Inspection5/24/20135/28/20135/28/2013PNH
DetailsForrest France
No access to complete inspection due to epoxy floor finishes underway.
INSP-Final Inspection5/23/20135/24/20135/24/2013ANR
DetailsForrest France
Mark J is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
INSP-Final Inspection5/17/20135/20/20135/20/2013APART
DetailsForrest France
Previous correction items verified for completion. Plan modification work okayed for cover at the new grid ceilings. Final pending replacement of painted heads in the lobby, meeting room and sanctuary/stage areas, ceiling tile and escutcheons not yet installed. Noted one upright head at the mechanical mezzanine to be relocated. Outside waterflow bell repaired while on site.
INSP-Final Inspection5/16/20135/17/20135/17/2013ANR
DetailsForrest France
Mark J is the contact Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus * Plans currently in "review" status.
INSP-Sprinkler Rough-in5/16/20135/17/20135/17/2013ANR
DetailsForrest France
Mark J is the contact Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus * Plans currently in "review" status.
INSP-Sprinkler Rough-in5/13/20135/14/20135/14/2013PPART
DetailsForrest France
Refer to clouded, initialed and dated locations on approved plan set for grid ceiling rooms and areas okayed for cover. Noted three missing uprights and one missing hanger above two rooms. Several areas now have grid ceilings where plans indicate open to structure. Painted upright heads will need to be replaced per NFPA 13 requirements.
INSP-Sprinkler Rough-in4/18/20134/19/20134/19/2013APASS
DetailsTroy Cobbley
See the city approved plans for locations marked "ok" in red where sprinkler piping can be covered