INSP-Final Inspection | 5/10/2013 | 5/10/2013 | 5/10/2013 | A | PASS |
Forrest France
|
|
|
Permit final approved.
|
INSP-Final Inspection | 5/2/2013 | 5/3/2013 | 5/3/2013 | A | PART |
Forrest France
|
|
|
Completed testing of notification appliances at the 1st floor NW corner open offices, breakroom and conference rooms. Verified necessary adjustments per previous inspection comments dated 4/2/13.
|
INSP-Conference | 5/1/2013 | 5/2/2013 | 5/2/2013 | A | CANC |
Forrest France
|
|
|
Troy, please call mike @ ###-####...please do not schedule any inspections, unless requested by Doherty Electric... Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
INSP-Sprinkler Rough-in/Hydro | 5/2/2013 | 5/3/2013 | 5/2/2013 | A | CANC |
Forrest France
|
|
|
Need to start at 7am..just a few devices. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
INSP-Final Inspection | 4/1/2013 | 4/2/2013 | 4/2/2013 | A | FAIL |
Troy Cobbley
|
|
|
I noted that the candella had been changed on several devices and an additional devices need to be provided in the conference room and the break room. No testing was done. As-builts will be needed showing the additional/changes of the devices.
|
INSP-Final Inspection | 3/25/2013 | 3/27/2013 | 3/26/2013 | A | CANC |
Forrest France
|
|
|
we will need to start at 7am please call Mike to confirm Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|