INSP-Final Inspection | 8/12/2013 | 8/12/2013 | 8/12/2013 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit approved for final.
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2013 | 7/17/2013 | 7/16/2013 | A | DONE |
Forrest France
|
|
|
Hydro completed 7/16
|
INSP-Final Inspection | 7/15/2013 | 7/16/2013 | 7/16/2013 | A | PART |
Forrest France
|
|
|
UG hydrostatic testing completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 7/12/2013 | 7/15/2013 | 7/15/2013 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow morning.
|
INSP-Sprinkler Rough-in | 6/14/2013 | 6/14/2013 | 6/14/2013 | P | PART |
Forrest France
|
|
|
Inspection intended for the remainder of UG fire supply line cover under project related FIR13-00214.
|
INSP-Sprinkler Rough-in | 4/23/2013 | 4/23/2013 | 4/23/2013 | A | PART |
Forrest France
|
|
|
UG fire supply line IBR is approved for bury.
|
INSP-Sprinkler Rough-in | 4/22/2013 | 4/22/2013 | 4/22/2013 | P | FAIL |
Troy Cobbley
|
|
|
The plans are locked up in the job shack. No inspection was performed.
|