INSP-Final Inspection | 11/4/2013 | 11/4/2013 | 11/5/2013 | P | PASS |
Forrest France
|
|
|
Corrections finished. Final walkthrough passed. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 10/31/2013 | 11/1/2013 | 11/1/2013 | A | PART |
Forrest France
|
|
|
Final pending relocation of the outside bell per plan and power supply to the air compressor.
|
INSP-Sprinkler Rough-in | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PART |
Forrest France
|
|
|
24 hr. air test of the new dry system completed with no pressure loss at the guage.
|
INSP-Sprinkler Rough-in/Hydro | 10/24/2013 | 10/24/2013 | 10/24/2013 | A | PART |
Troy Cobbley
|
|
|
Dry system air test started at 9:30 with 44psi on the guage.
|
INSP-Sprinkler Rough-in | 10/22/2013 | 10/22/2013 | 10/22/2013 | A | PART |
Forrest France
|
|
|
Okay to cover overhead work at the kitchen grid ceilings.
|
INSP-Sprinkler Rough-in/Hydro | 10/21/2013 | 10/21/2013 | 10/21/2013 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test completed and passed for both the dry and wet systems.
|
INSP-Sprinkler Rough-in | 8/19/2013 | 8/19/2013 | 8/19/2013 | A | PART |
Forrest France
|
|
|
OH rough-in inspection completed.
|
INSP-Sprinkler Rough-in | 8/12/2013 | 8/13/2013 | 8/13/2013 | A | PART |
Forrest France
|
|
|
Completed overhead rough-in of the new wet and dry systems. Noted one missing EQ brace at the lower level 4" main, provide seismic clearance at the main through masonry wall west end. Additional uprights and branchline to be shown on record drawings. Non-sprinklered combustible concealed pockets to be filled with insulation as discussed with contractor to meet the allowable exceptions per NFPA. Discussed hydro and air testing, riser room yet to be built, FDC location, etc.
|
INSP-Supply line flush | 7/1/2013 | 7/1/2013 | 7/1/2013 | P | PASS |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|