INSP-Sprinkler Rough-in/Hydro | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PASS |
Craig D. Hanson
|
|
|
|
INSP-Final Inspection | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PASS |
Craig D. Hanson
|
|
|
|
INSP-Supply line flush | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PASS |
Troy Cobbley
|
|
|
Underground tie-ins on both sides of the building are ok to cover and the underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2013 | 10/23/2013 | 10/23/2013 | P | CANC |
Troy Cobbley
|
|
|
Please call Troy Nelson with Time frame. This is for underground cover inspection and flush inspection. We have two sections of underground to flush. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
|
INSP-Supply line flush | 10/23/2013 | 10/23/2013 | 10/23/2013 | P | CANC |
Troy Cobbley
|
|
|
Please call Troy Nelson with Time frame. This for cover inspection and flush inspection. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
|
INSP-Sprinkler Rough-in | 6/25/2013 | 6/26/2013 | 6/26/2013 | A | PART |
Troy Cobbley
|
|
|
The underground stub-out and the stub-in is ok to cover. No thrust blocking is being used since troy is gong to "rod" the IBR to the 90 elbows. This will need to be verified when the remaining underground is installed.
|