INSP-Final Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 | A | PASS |
Forrest France
|
|
|
Plan modification site verified. Final inspection passed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 9/15/2014 | 9/16/2014 | 9/16/2014 | A | PART |
Forrest France
|
|
|
Rough-in inspections for changes at the 1st and 2nd floor office and common areas east side completed.
|
INSP-Final Inspection | 8/15/2014 | 8/18/2014 | 8/18/2014 | A | PART |
Forrest France
|
|
|
Final pending revised drawings to include work at the 1st and 2nd floor reception and adjacent office, open and breakroom areas not originaly included.
|
INSP-Sprinkler Rough-in | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | PART |
Forrest France
|
|
|
Inspection completed for overhead work at the reception area and adjacent offices- relocated heads and adjusted coverage.
|
INSP-Sprinkler Rough-in | 6/20/2014 | 6/23/2014 | 6/23/2014 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 5/16/2014 | 5/19/2014 | 5/19/2014 | P | PART |
Forrest France
|
|
|
Inspection for modifications at the 1st and 2nd floor existing adjacent office and breakroom areas. This work to be shown on revised drawings per discussion.
|
INSP-Sprinkler Rough-in | 4/22/2014 | 4/22/2014 | 4/22/2014 | A | PART |
Forrest France
|
|
|
Walkthrough of the 1st and 2nd floor new office addition completed. Noted obstructions to coverage at the 2nd floor executive locker room, covered sprinkler and missing escutcheon at mechanical room. Remainder okayed.
|
INSP-Sprinkler Rough-in/Hydro | 2/18/2014 | 2/19/2014 | 2/19/2014 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic test of the new system piping completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 2/14/2014 | 2/18/2014 | 2/18/2014 | A | DEFR |
Forrest France
|
|
|
Leroy is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 1/17/2014 | 1/21/2014 | 1/21/2014 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was for the pendant heads installed in the suspended "clouds". Installation and spacing appeared ok.
|
INSP-Sprinkler Rough-in/Hydro | 12/30/2013 | 12/30/2013 | 12/30/2013 | P | PART |
Forrest France
|
|
|
Refer to dated annotations for areas okayed to cover.
|
INSP-Sprinkler Rough-in | 12/26/2013 | 12/27/2013 | 12/27/2013 | A | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler work at the second floor north end stairway grid ceiling.
|
INSP-Sprinkler Rough-in | 10/3/2013 | 10/4/2013 | 10/4/2013 | P | PART |
Forrest France
|
|
|
Inspection regarding conditions per NFPA 13 2010 8.6.5.1.2 and 8.6.5.3.3.
|
INSP-Sprinkler Rough-in | 9/20/2013 | 9/23/2013 | 9/23/2013 | A | PART |
Forrest France
|
|
|
Overhead work at the first floor mens and womens restrooms and adjacent corridor soffit, and second floor RR's and mechanical room are okay for sheetrock ceiling cover. Discussed project schedule, hydrostatic testing, and plan modifications due to field changes.
|
INSP-Sprinkler Rough-in | 9/19/2013 | 9/20/2013 | 9/20/2013 | P | CANC |
Forrest France
|
|
|
Overbooked
|