INSP-Final Inspection | 5/10/2016 | 5/10/2016 | 5/10/2016 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 3/17/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Jim Page
|
|
|
Audio/visuals tested for first level, all A/V devices inspected passed operational and visual inspection. A/V testing complete for this scope of work.
|
INSP-Final Inspection | 2/10/2016 | 2/10/2016 | 2/10/2016 | A | PART |
Jim Page
|
|
|
Devices associated with fire sprinkler systems tested, tampers, flow switches, high/low air switches and pre-action pressure switches, devices operated correctly, water flow pressure switches on pre-action systems reported to fire panel as a supervisory, pre-action flow switches will be reprogrammed to come in as water flow alarm with exterior bell activation. Riser rooms inspected/tested were located on the east side of building and southeast side of building.
|
INSP-Final Inspection | 11/3/2015 | 11/3/2015 | 11/3/2015 | A | PART |
Jim Page
|
|
|
Inspected visual/audible notification for mezz/mech level, items inspected passed/complete
|
INSP-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 | A | PART |
Forrest France
|
|
|
Completed walkthrough and functional testing for fire alarm work at the basement level plan sheets 2.0.1 thru 2.0.5. Items noted include; adjust visual notification coverage at three locations to meet spacing at end of corridors, delete or relocate SD for door hold release at NW side, noted non-functional horns at various areas, device address changes at the solvents rooms completed while on site. Also noted missing HD at the elevator machine room-(state elevator certification dated 2014). Manual pull stations, smoke detectors and visual notification tested satisfactory.
|