Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR13-00433
StatusFinaled
Name ALL VALLEY FIRE
Site Address 6401 S EISENMAN RD Unit: 102
Project NameAll Valley Fire T.I.
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

(ALL VALLEY FIRE – Quarry Business Complex Ste# 101 & 102) Permit is to build out a 4,604 square foot fire protection tenant (4,247 sq. ft. 1st floor / 357 sq. ft. 2nd floor / 875 sq. ft. enclosed mezzanine)in an existing 20,268 square foot shell and core building (BLD07-00349). This building if fire sprinklered for non-separated uses and area increase. Approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing walls to create two private offices, an open office area, a storage balcony, a plan room, two unisex accessible restrooms, a break room, a conference room, and a storage closet], installation of new load bearing walls / floor to create a new second floor and mezzanine area, installation of new guard rails on storage balcony, installation of new electrical, installation of new accessible bathroom fixtures, installation of mop sink, new high / low drinking fountain, construction of two new interior open stairways, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/31/201311/1/201311/1/2013APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in9/17/20139/17/20139/17/2013PPART
DetailsForrest France
Overhead work at the second floor sheetrock ceilings okayed for cover- plans indicate grid ceilings.