Permit Information
Permit NumberFIR13-00440
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1109 W MAIN ST
Project NameOwyhee Place
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of relocating existing 2 1/2" main and reconnect existing branch lines with new/relocated sprinkler heads. Relocate existing fire pump and extending the underground supply.

Plan Mod #1 – 10/23/2013

Plan Mod #2 – 3/07/2014
FP0.1 – Revised layout in elevator lobby. Added sprinklers in crawl space under 1st floor.
FP-1 - Revised layout throughout the 1st floor .
FP-2 – Added sheet and revised layout throughout the 2nd floor.


(OWYHEE PLACE - APARTMENTS, MEETING ROOM CORE, AND OFFICE CORE) Fire sprinkler system used for area, story, and height increase. To renovate an existing 7 story building. Interior non-structural demolition work was done under permit BLD13-01010. On August 23, a plan modification was done to the demolition permit to include the removal of exterior nonstructural veneer brick on the Main Street and 11th Street sides of the historic portion of this building at the 1st story and to include the removal of the fire escape from the South exterior wall of the historic portion of this building. Early start permit BLD13-01955 was also issued. A portion of this building is historic and other portions are NOT historic. The 2nd, 3rd, and 4th stories of the non-historic former West hotel wing will be converted to 36 rental apartments (total occupant load of 130). This permit is intended to establish a Certificate of Occupancy for the new apartments. Alterations to the West apartment wing are regulated by the energy code. This permit does not establish a Certificate of Occupancy for any other portion of the building. Core work will also be done under this permit within the 7 story historic portion of this building. Alterations to the historic portion of this building are not regulated by the energy code. Certificate of Occupancies will be established for tenants located within the historic portion of this building, including the 7th story terrace, under future separate tenant improvement permits. Within the historic portion, new restrooms will be provided on the 1st story and on the 2nd story. Assembly rooms on the 2nd story will be expanded or combined. Egress will be upgraded on all stories. Trellis structures at grade will be constructed. New storefront windows will be installed at grade. Several other windows will also be replaced. Accessibility to the disabled will be improved on the 1st story by installing a wheelchair lift. Core areas on the 3rd, 4th, 5th, and 6th stories will be remodeled with new restrooms created. A new mechanical shaft will be constructed. The vault below the Main Street sidewalk will be abandoned. The sidewalk will be demolished, a retaining wall will be constructed below and parallel with the North exterior building wall, and the vault will be backfilled with structural fill. Special Inspection is required for concrete, masonry, welding, and epoxy anchors. This building will be connected to the downtown geothermal system. The fire sprinkler system shall comply with NFPA 13 and the fire alarm system shall comply with NFPA 72 as new systems and as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/22/20149/23/20149/23/2014APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in7/7/20147/7/20147/7/2014PPART
DetailsForrest France
Completed walkthrough of 2nd floor core and common areas including restrooms for fire sprinkler finishes. Verified added coverage at 2" CPVC main.
INSP-Final Inspection7/3/20147/7/20147/7/2014APART
DetailsForrest France
Completed walkthrough for fire sprinkler finishes at the 1st floor core, lobby, reception, and common areas. Missing escutcheon replaced while on site, verified outside waterflow bell. Need to provide coverage at a closet or meet exceptions per NFPA 13.
INSP-Sprinkler Rough-in7/3/20147/3/20147/3/2014PPART
DetailsForrest France
Inspection for 2nd floor west lobby, north lobby and core area grid ceilings passed rough-in, okayed for cover. Need to provide upright protection at the exposed 2" CPVC feed main (apartments) located in the future office shell area.
INSP-Final Inspection7/1/20147/2/20147/2/2014PPART
DetailsForrest France
Verified seismic bracing at the basement level 2 1/2" main north side.
INSP-Final Inspection7/1/20147/1/20147/1/2014PPART
DetailsForrest France
Inspection for scope of work at the basement level. Discussed seismic bracing, standard response heads, pump layout, added and relocated sprinkler coverage.
INSP-Final Inspection6/30/20146/30/20147/1/2014PPART
DetailsForrest France
Completed walkthrough for the 7th floor overhead finish work.
INSP-Sprinkler Rough-in6/30/20146/30/20147/1/2014PPART
DetailsForrest France
Terry-basement floor only please Phone #: ###-####
INSP-Sprinkler Rough-in6/25/20146/26/20146/26/2014ANR
DetailsForrest France
2nd floor corridior rough-in not ready for inspection due to painting underway.
INSP-Sprinkler Rough-in6/18/20146/19/20146/19/2014APART
DetailsForrest France
2nd floor storage room, bride room and hallway as dated on plans passed rough-in pending approved plan mod reflecting field changes.
INSP-Sprinkler Rough-in6/16/20146/16/20146/16/2014PPART
DetailsForrest France
!st floor main at entry vestibule, 2nd floor girid ceiling above west stairway as marked and dated on plans approved for cover.
INSP-Sprinkler Rough-in6/13/20146/13/20146/13/2014PPART
DetailsForrest France
EC heads at the banquet room 1st floor approved for cover. Re-inspection at the main street entry vestibule and lobby okayed. Noted the need to remove valves in sensing lines at the FP and JP.
INSP-Sprinkler Rough-in6/12/20146/13/20146/13/2014AFAIL
DetailsForrest France
Inspection for overhead cover at the 1st floor main street side entry lobby and vestibule failed due to overspaced pendent heads and missing hanger at the main.
INSP-Sprinkler Rough-in6/2/20146/2/20146/2/2014APART
DetailsForrest France
Regarding conditions for ceiling pockets per NFPA 13 8.6.7.2 (1-6).
INSP-Sprinkler Rough-in5/28/20145/29/20145/29/2014APART
DetailsForrest France
Basement level elevator lobby grid ceiling as marked and dated on approved plans okayed for cover.
INSP-Sprinkler Rough-in5/12/20145/13/20145/13/2014APART
DetailsForrest France
1st floor mens and womens restroom entry vestibules approved for cover as marked and dated on stamped plan set.
INSP-Sprinkler Rough-in5/5/20145/5/20145/5/2014APART
DetailsForrest France
Install at plan mod two sheets FP0.1- FP1 passed rough-in.
INSP-Sprinkler Rough-in4/23/20144/24/20144/24/2014APART
DetailsForrest France
Inspection for cover at the 1st floor west entry and corridor sheetrock ceiling areas- refer to clouded notes with today's date on stamped plans.
INSP-Sprinkler Rough-in4/22/20144/22/20144/22/2014APART
DetailsForrest France
OH rough-in as marked on stamped plans at the lobby and reception areas okayed.
INSP-Sprinkler Rough-in4/17/20144/18/20144/18/2014APART
DetailsForrest France
Okay to cover overhead work at the 5th floor mens and womens restrooms and adjacent vestibules- Refer to dated annotations on stamped plan set.
INSP-Sprinkler Rough-in4/17/20144/17/20144/17/2014PCANC
DetailsForrest France
Terry Nelson Phone #: ###-#### - - terry called in and canceled and reschuled for tomorrow morning /// 4-17-14 ps
INSP-Sprinkler Rough-in3/26/20143/26/20143/26/2014APART
DetailsForrest France
1st floor hard lid areas as marked on plans okay for cover-
INSP-Sprinkler Rough-in3/24/20143/25/20143/25/2014APART
DetailsForrest France
Okay to cover overhead work at the first floor sheetrock ceilings "oasis" area and east elevator lobby as clouded and dated on approved plans. Discussed project schedule and hydro testing.
INSP-Sprinkler Rough-in3/20/20143/20/20143/20/2014PPART
DetailsForrest France
Verified coverage per plan mod #2 sheet FP0.1 - upright protection at the crawl space below 1st floor. 1st floor reception, west elevator lobby, mens and womens restrooms, and mail room ceilings approved for cover, marked on plans with todays date.
INSP-Sprinkler Rough-in12/2/201312/3/201312/3/2013ANR
DetailsForrest France
Project not in condition to complete a satisfactory pump acceptance test at this time.
INSP-Sprinkler Rough-in/Hydro12/2/201312/2/201312/2/2013PPART
DetailsForrest France
Completed hydrostatic test of the new suction piping at the fire pump.
INSP-Sprinkler Rough-in/Hydro11/27/201311/27/201311/27/2013PPEND
DetailsForrest France
This is for a fire pump test please call Lonnie for time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham *Refer to NFPA 20 regarding items to be completed prior to pump acceptance testing including pump, valve and controler monitoring (run, power loss, phase reversal, tampers, etc.), complete a hydrostatic test for both suction and discharge piping, provide test equipment to verify volts, amperes and pump speed during operation, ensure wiring has been completed and checked by the electrical contractor previous to initial startup. Provide certified pump curve for field comparison.
INSP-Sprinkler Rough-in11/20/201311/21/201311/21/2013APART
DetailsForrest France
UG fire supply line and yard PIV at Main street okayed for cover.
INSP-Sprinkler Rough-in10/31/201310/31/201311/1/2013PPART
DetailsForrest France
Rough-in for the 7th floor completed- okay to cover areas with sheetrock ceilings at the RR's and hallway. Missing coverage at one closet per plan- ref. dated annotation. Also noted lacking coverage (existing conditions) at the elevator machine room, penthouse, and some areas between floor levels of the basement, 1st and 2nd.
INSP-Sprinkler Rough-in6/9/20146/9/2014 P 
DetailsForrest France