INSP-Final Inspection | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | PASS |
Troy Cobbley
|
|
|
Correction made. Permit finaled.
|
INSP-Final Inspection | 9/11/2013 | 9/12/2013 | 9/12/2013 | P | PART |
Forrest France
|
|
|
Final pending points map at the panel, zones 5 and 6 are reversed, need record of completion paperwork. Plugs at duct detector removed while on site. Remainder of inspection items passed including MP station, SD, kitchen hood, flow and tamper, DD, panel batteries, panel items.
|