Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR13-00509
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 800 W MAIN ST Unit: 1500
Project NameHolland and Hart 15th Floor TI
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

This building is sprinklered to comply as a high-rise building. Permit is to build out for the first time the entire 16,828 square foot 15th floor (Shell and Core done under BLD12-01991) as offices. Work is to include: [construction of interior none bearing walls to create; 43 offices, 8 open office areas, 4 small storage area, two conference rooms (under 400 sq. ft), a coffee / break room, and two copy/print areas], installation of a new lighting, installation of new plumbing, installation of new mechanical, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: Reference ePlanReview case BLD13-01691 for review. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/30/20141/31/20141/31/2014APASS
DetailsForrest France
Fire sprinkler final walkthrough completed- Inspection passed. One missing escutcheon at the west conference room to be installed as agreed.
INSP-Sprinkler Rough-in1/7/20141/8/20141/9/2014PPART
DetailsForrest France
Fire sprinkler work okay for cover at the grid ceilings.
INSP-Sprinkler Rough-in12/2/201312/3/201312/18/2013PPART
DetailsForrest France
INSP-Sprinkler Rough-in11/8/201311/12/201311/12/2013PPART
DetailsCraig D. Hanson
Cover of hard lids. pass