INSP-Final Inspection | 4/28/2014 | 4/30/2014 | 4/30/2014 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 4/21/2014 | 4/21/2014 | 4/21/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 3/6/2014 | 3/7/2014 | 3/7/2014 | A | CANC |
Troy Cobbley
|
|
|
Please call Perly 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Final Inspection | 3/5/2014 | 3/6/2014 | 3/6/2014 | A | CANC |
Troy Cobbley
|
|
|
Pls call Perly 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
|
INSP-Final Inspection | 3/5/2014 | 3/7/2014 | 3/5/2014 | A | CANC |
Troy Cobbley
|
|
|
Pls call Perly 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 2/7/2014 | 2/7/2014 | 2/7/2014 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping can be covered
|
INSP-Sprinkler Rough-in | 1/27/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Troy Cobbley
|
|
|
Not ready for an underground flush but the above ground rough-in inspection passed except the pendant head in the gas fire place still needs installed and the batt insulation installed on the branchline risers prior to a cover approval on the piping.
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2013 | 10/17/2013 | 10/17/2013 | A | PASS |
Troy Cobbley
|
|
|
2" Poly underground supply piping is ok to cover
|