INSP-Final Inspection | 8/15/2014 | 8/18/2014 | 8/18/2014 | P | PASS |
Forrest France
|
|
|
Fire alarm work passed inspection and testing after corrections made while on site. Permit finaled.
|
INSP-Final Inspection | 8/12/2014 | 8/15/2014 | 8/15/2014 | A | PART |
Forrest France
|
|
|
|
INSP-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 | A | PART |
Forrest France
|
|
|
Forrest, We would like to have this first thing in the morning if at all possible. This would be for a partial, and will involve only the inspection of the new office area, first and second floors. The existing office, and the warehouse will be at a future date.
Please call me as soon as possible, so I can have the appropriate paperwork ready for you, and can advice the contractor of an approximate time.
Thank you, Jason. ###-#### Phone #: ###-#### >> Inspection requested via web by Jason Minnick
|