Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR13-00580
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 190 E BANNOCK ST
Project NameSL EAST TOWER ENDOSCOPY
Customer Number 
ePlanReviewYes
Description
Quick Permit
Add, plug and relocate sprinklers to accommodate new wall and ceiling configuration.

(ST LUKES-EAST TOWER-GROUND FLOOR)(Endoscopy Suite Remodel) To remodel a 3,122 square foot Endoscopy Suite within an existing I-2 hospital. Approval of this remodel is contingent upon adhering to the approved plans and structural engineering on file. Scope of work includes: new interior partitions to redefine endoscopy procedure room, new interior partitions to redefine instrument processing and decontamination room, new lighting, new structural bracing / attachment of new equipment to structural slab above, modify existing mechanical system, installation of new plumbing, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/22/20147/23/20147/23/2014APASS
DetailsTroy Cobbley
Permit finaled.
INSP-Sprinkler Rough-in7/14/20147/15/20147/15/2014APASS
DetailsTroy Cobbley
See the city approved plans for area where piping can be covered marked with todays date
INSP-Sprinkler Rough-in/Hydro5/6/20145/6/20145/6/2014APART
DetailsForrest France
Overhead rough-in to date completed okay.
INSP-Sprinkler Rough-in4/29/20144/29/20144/29/2014PPART
DetailsForrest France
Endo room number 4 as marked and dated on plans approved for ceiling cover.
INSP-Sprinkler Rough-in2/5/20142/6/20142/6/2014APART
DetailsForrest France
Overhead fire sprinkler work at endo #1 and procedure rooms as marked on stamped plans approved for cover. Revised drawings to be provided at next inspection for branchline routing changes due to building/system zone separation.