INSP-Final Inspection | 9/17/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Thomas Walsh
|
|
|
Duplicate request - Final inspection of FS U/G supply - PASSED Tamper valve interface with fire alarm system OK
|
INSP-Sprinkler Rough-in | 9/17/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Thomas Walsh
|
|
|
Duplicate request - Final inspection of FS U/G supply - PASSED Tamper valve interface with fire alarm system OK
|
INSP-Sprinkler Rough-in/Hydro | 9/17/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Thomas Walsh
|
|
|
Final inspection of FS U/G supply - PASSED Tamper valve interface with fire alarm system OK
|
INSP-Final Inspection | 5/29/2015 | 6/1/2015 | 6/1/2015 | P | CANC |
Thomas Walsh
|
|
|
Final signoff on FSUG cannot be granted until fire alarm system interface components, including tampers and waterflows, can be completed.
|
INSP-Sprinkler Rough-in/Hydro | 5/29/2015 | 6/1/2015 | 5/29/2015 | P | CANC |
Thomas Walsh
|
|
|
Please call Leroy 30 mins prioor Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in/Hydro | 5/18/2015 | 5/19/2015 | 5/19/2015 | A | PASS |
Thomas Walsh
|
|
|
Hydrotest of FSUG system - from city check valve to BFP. No loss of pressure noted for 2 hours. System has been flushed at previous inspection.
|
INSP-Sprinkler Rough-in/Hydro | 5/18/2015 | 5/19/2015 | 5/18/2015 | P | CANC |
Troy Cobbley
|
|
|
Rough in Hydro UG Please call Leroy 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Conference | 4/24/2015 | 4/27/2015 | 4/27/2015 | A | DONE |
Katie Marron
|
|
|
TOB Bldg. J - Underground. Phone conference complete. Verified that underground fire line must be able to hold 200 psig. General contractor installed up to PIV and only holds 130 psig currently.
|
INSP-Supply line flush | 2/13/2015 | 2/13/2015 | 2/13/2015 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed
|
INSP-Sprinkler Rough-in | 7/14/2014 | 7/14/2014 | 7/14/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover.
|