INSP-Final Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough and inspection. Coverage below elevated tanks approved per R. Gervais.
|
INSP-Final Inspection | 5/19/2014 | 5/19/2014 | 5/19/2014 | P | NR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test completed satisfactory.
|
INSP-Sprinkler Rough-in | 4/15/2014 | 4/15/2014 | 4/15/2014 | P | PART |
Forrest France
|
|
|
OH work completed to date okayed, stairs to mezzanine under construction.
|
INSP-Sprinkler Rough-in | 3/31/2014 | 3/31/2014 | 3/31/2014 | P | PART |
Forrest France
|
|
|
Regarding possible obstructions
|
INSP-Sprinkler Rough-in | 3/24/2014 | 3/24/2014 | 3/24/2014 | P | PART |
Forrest France
|
|
|
Rough-in completed to date okayed. Coverage under mezzanine stairs, and portions of the riser are unfinished at this time. Elevated tanks over 4' may need additional coverage below.
|
INSP-Sprinkler Rough-in | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | PART |
Forrest France
|
|
|
Fire sprinkler work at the mens and womens restroom, utility, hallway and cooler approved for cover as marked/dated on approved plan set.
|