Permit Number | FIR14-00181 |
Status | Finaled |
Name |
TREASURE VALLEY FIRE PROTECTION
|
Site Address |
1087 W RIVER ST Unit: 160
|
Project Name | IDAHO PRIMARY CARE T.I. #160 |
Customer Number | |
ePlanReview | Yes |
Description |
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration. Changing sprinklers to quick responset type.
This is for general office space only no medical office space. Project is to remodel 3,258 sf of existing office space created under BLD09-01893. Scope of work to include minor demolition and construction of nonbearing noncombustible walls creating 4 new offices, 1 new conference room, enlarge existing copy room and create reception area. Other spaces left as existing. Alterations will include some limited work on the existing ceiling grid, finish material, electrical. All interior finish material shall meet the requirements of chapter 8 IBC. NOTE: This building is fully fire sprinklered for a story increase. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
|