INSP-Final Inspection | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | PASS |
Forrest France
|
|
|
Remainder of fire alarm work passed final inspection and testing.
|
INSP-Alarm Testing | 2/17/2015 | 2/19/2015 | 2/19/2015 | A | PART |
Forrest France
|
|
|
Completed functional testing of notification appliances at the cafe, MP stations at the 6th street side exits only.
|
INSP-Alarm Testing | 1/21/2015 | 1/23/2015 | 1/23/2015 | A | PART |
Forrest France
|
|
|
Completed functional testing of notification appliances at the remodel area phase one first floor HR dept. only.
|