Permit Information
Permit NumberFIR14-00269
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 415 E PARKCENTER BLVD
Project NameSage International School TI
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

There was a demo permit FIR14-00247

NOTE: This project is a change of use, therefore, shall comply with current code. (Ref: IFC 2012: 102.3)

(Phase one) remodel the northern 30,000 sf (approximate) of existing parkcenter mall building, and modify the site to accommodate drop-off/pick-up area and a playfield where the former bank pad stood. Interior construction to include demolition of all partition walls, interior finishes, etc. and the construction of new partition walls to form 24 classrooms, 3 offices, 2 banks of restrooms, staff room, and commons/lunch room. Insert windows in identified exterior walls to bring light into classrooms. Replace parapet cap. Paint all exterior walls and parapet cap. Replace roof on entire building.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/7/20148/7/20148/7/2014PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection8/5/20148/5/20148/5/2014PPART
DetailsForrest France
Items needed prior to final include; provide intermediate temp sprinkler at the main entry area womens restroom adjacent to the HVAC diffuser, remove two travel clips at the south classroom, existing system is overdue annual inspection. Missing escutcheons installed while on site. Remainder of final walkthrough passed.
INSP-Sprinkler Rough-in7/25/20147/28/20147/28/2014APASS
DetailsCraig D. Hanson
all areas have been inspected and passed for rough in cover. Hydro done and pass.
INSP-Sprinkler Rough-in7/23/20147/23/20147/23/2014APART
DetailsForrest France
Grid ceiling areas as marked on plans okayed for cover.
INSP-Sprinkler Rough-in7/22/20147/22/20147/22/2014PPART
DetailsForrest France
Inspection for cover at grid ceilings completed to date- Items noted include; insufficient coverage the janitors and IT rooms due to OTS ceiling configuration, need to add upright coverage at a concealed space overbuild above classroom 119. Commons classroom, corridor grid, and main tie-in above the 5th grade classroom are not yet finished. Verified added uprights along the north and south main corridor rated walls. Discussed hydrostatic testing per review notes and NFPA guidelines. Need record drawings for field modifications. Remainder of classrooms approved for ceiling cover as noted on plans.
INSP-Sprinkler Rough-in7/8/20147/9/20147/10/2014APART
DetailsForrest France
Okay to cover upright protection at the south end of the central skylight past the fire wall. *Note- existing upright sprinklers at the west corridor and adjacent classrooms in need of adjustment to maintain deflectors parallel to the ceiling in accordance with NFPA 13 2013 sec. 8.1(3) and 8.6.4.2.1.
INSP-Sprinkler Rough-in7/8/20147/8/20147/8/2014PPART
DetailsForrest France
For overhead cover at grid ceilings
INSP-Sprinkler Rough-in7/3/20147/7/20147/7/2014APART
DetailsForrest France
Inspection for overhead cover at an office, two restrooms, vestibule, and seven classrooms as marked and dated on approved plans okayed for drop ceiling cover. Need to add upright protection at one pocket above the NW corner of the 5th grade classroom, provide intermediate temp head at the office due to proximity to an HVAC diffuser.
INSP-Sprinkler Rough-in6/25/20146/25/20146/25/2014PPART
DetailsForrest France
Sheetrock soffits as dated on plans okayed for cover. Modifications at the atrium area to show on plan mod., need to add one head below ductwork at the concealed space per discussion.
INSP-Sprinkler Rough-in6/24/20146/24/20146/24/2014PPART
DetailsForrest France
INSP-Sprinkler Rough-in6/23/20146/23/20146/23/2014PPART
DetailsForrest France
Okay to cover overhead work at sheetrock ceilings in selected areas as marked/dated on approved plans. Noted two locations at corridor vestibules in need of spacing adjustments.