INSP-Final Inspection | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed. Forward flush passed. Backflow is certified. Need painted head changed.
|
INSP-Sprinkler Rough-in/Hydro | 9/26/2014 | 9/29/2014 | 9/29/2014 | A | PART |
Troy Cobbley
|
|
|
24 hour air test started at 9:00 am with pressure marked on guage
|
INSP-Final Inspection | 9/25/2014 | 9/26/2014 | 9/26/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide certification of backflow, provide forward flush test, replace painted heads. 24 hour air test has not been performed. Air test started with pressure marked on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | PASS |
Troy Cobbley
|
|
|
Wet system hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PART |
Troy Cobbley
|
|
|
Above ground hydro for the wet system failed due to drop on the guage and puddle on the floor. The dry pipe sysetm passed hydro
|
INSP-Sprinkler Rough-in/Hydro | 9/5/2014 | 9/10/2014 | 9/10/2014 | A | CANC |
Troy Cobbley
|
|
|
Wrong permit number called in.
|
INSP-Supply line flush | 9/5/2014 | 9/10/2014 | 9/10/2014 | A | CANC |
Troy Cobbley
|
|
|
Wrong permit number called in.
|
INSP-Sprinkler Rough-in | 6/12/2014 | 6/13/2014 | 6/13/2014 | A | PASS |
Troy Cobbley
|
|
|
Branch line restraint s have been installed on the dry system piping. Piping can be covered.
|
INSP-Sprinkler Rough-in | 6/11/2014 | 6/12/2014 | 6/12/2014 | P | PART |
Troy Cobbley
|
|
|
Dry system rough-in passed except the branchline siesmic restraints are missing.
|