Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR14-00304
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 150 N CAPITOL BLVD
Project NameBoise City Hall / Improvements
Customer Number 
ePlanReviewYes
Description
This is to change 27 sprinkler heads from SR pendent to QR uprights with guard while the ceiling grid is demoed. Once the ceiling grid is reinstalled New QR pendent will be installed in new ceiling grid. Also part of the float main and line will be removed for structural work then reinstalled when structural work is complete.

(BOISE CITY HALL – Phase II Code Improvements) The main scope of work within this permit is to upgrade the existing parking garage, Annex and CH2 to make them more seismically resistant. A tenant improvement for a portion of the HR Dept in the Annex is also included within this scope of work. Work is to include: [structural upgrades including: new concrete sheer walls, new collectors, repair concrete beams, and concrete deck repair], [construction of interior non-bearing walls to create eight private offices, a conference room, and a copy room], exterior site improvements, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/15/20156/17/20156/17/2015APASS
DetailsJim Page
Fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in3/19/20153/19/20153/19/2015PPART
DetailsForrest France
Overhead work at the 1st floor HR office, IT infastructure room, HR area grid ceilings okayed for cover. Noted overspaced coverage at the print room file storage area.
INSP-Sprinkler Rough-in2/18/20152/19/20152/19/2015APART
DetailsForrest France
Fire sprinkler work at the cafeteria area grid ceilings approved for cover.
INSP-Conference2/5/20152/6/20152/6/2015ADONE
DetailsForrest France
Regarding sprinkler coverage at the corridor north side of annex one.
INSP-Sprinkler Rough-in1/14/20151/14/20151/16/2015PPART
DetailsForrest France
Verified added seismic brace at the first floor NE side, okayed for cover overhead work at the mail and print shop 1st floor- refer to dated annotations on plans. Need to provide new quick response heads per scope of permit work throughout the first floor- noted mixed standard and QR heads in the mail and print shop areas. Also completed rough-in inspection of the new dry system at the 2nd floor parking garage- items noted include; overspacing between two branchlines west end, missing coverage at the vestibule, provide flexible couplings at riser main between floors, missing forward flow provision at the riser, new outside WF bell needed.
INSP-Sprinkler Rough-in12/29/201412/30/201412/30/2014APART
DetailsForrest France
Completed inspection for new pendent heads at phase one area grid ceilings. Provide plan modification to match field install and new floorplan including several deleted offices. Missing seismic brace at the main north end.