INSP-Final Inspection | 6/15/2015 | 6/17/2015 | 6/17/2015 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 3/19/2015 | 3/19/2015 | 3/19/2015 | P | PART |
Forrest France
|
|
|
Overhead work at the 1st floor HR office, IT infastructure room, HR area grid ceilings okayed for cover. Noted overspaced coverage at the print room file storage area.
|
INSP-Sprinkler Rough-in | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PART |
Forrest France
|
|
|
Fire sprinkler work at the cafeteria area grid ceilings approved for cover.
|
INSP-Conference | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | DONE |
Forrest France
|
|
|
Regarding sprinkler coverage at the corridor north side of annex one.
|
INSP-Sprinkler Rough-in | 1/14/2015 | 1/14/2015 | 1/16/2015 | P | PART |
Forrest France
|
|
|
Verified added seismic brace at the first floor NE side, okayed for cover overhead work at the mail and print shop 1st floor- refer to dated annotations on plans. Need to provide new quick response heads per scope of permit work throughout the first floor- noted mixed standard and QR heads in the mail and print shop areas. Also completed rough-in inspection of the new dry system at the 2nd floor parking garage- items noted include; overspacing between two branchlines west end, missing coverage at the vestibule, provide flexible couplings at riser main between floors, missing forward flow provision at the riser, new outside WF bell needed.
|
INSP-Sprinkler Rough-in | 12/29/2014 | 12/30/2014 | 12/30/2014 | A | PART |
Forrest France
|
|
|
Completed inspection for new pendent heads at phase one area grid ceilings. Provide plan modification to match field install and new floorplan including several deleted offices. Missing seismic brace at the main north end.
|