INSP-Final Inspection | 8/7/2015 | 8/11/2015 | 8/11/2015 | P | PASS |
Thomas Walsh
|
|
|
Reinspection of Ansul FP system for the 1st floor kitchen lobby area. Previous test passed for balloon test, MP. gas/electric shut off, detection, etc. Just needed to confirm nozzle types and placement, which looked OK and a barrier between the DF fryer and the gas grill.
|
INSP-Final Inspection | 7/31/2015 | 8/3/2015 | 8/3/2015 | P | PART |
Thomas Walsh
|
|
|
First floor kitchen hood and duct system test, including balloon test, MP, detection gas/electric shutoffs, nozzles types, etc. Alltested OK NOTE: Nozzle placement may have to be modified to point in the locations per the manual (center of appliance). Also, may need to have a barier between the DF fryer and the gas range - currently 6" with no barrier.
|