INSP-Final Inspection | 10/27/2014 | 10/28/2014 | 10/28/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Troy Cobbley
|
|
|
Ovehead hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2014 | 10/23/2014 | 10/23/2014 | P | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed
|
INSP-Supply line flush | 10/22/2014 | 10/22/2014 | 10/22/2014 | P | PASS |
Craig D. Hanson
|
|
|
Flush good. Concrete around riser needs to be broken up and looked at on another inspection.
|
INSP-Supply line flush | 9/30/2014 | 10/1/2014 | 10/1/2014 | P | CANC |
Troy Cobbley
|
|
|
Not ready
|
INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | CANC |
Troy Cobbley
|
|
|
Brandon-underground flushing Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 | P | CANC |
Troy Cobbley
|
|
|
Underground hydro - Brandon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed .Tenting passed. Piping is ok to cover.
|
INSP-Sprinkler Rough-in | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can not be covered until a tenting inspection has been performed
|
INSP-Sprinkler Rough-in | 8/20/2014 | 8/20/2014 | 8/20/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply is ok to cover
|