INSP-Final Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Troy Cobbley
|
|
|
Final previously performed with Tim Frost.
|
INSP-Final Inspection | 4/3/2015 | 4/6/2015 | 4/6/2015 | P | PASS |
Tim Frost
|
|
|
One drop was too long in the work shop. The flow switch kept getting stuck. Leroy is suppose to call when the items are corrected.
Spoke with Leroy 4/07/2015. He said the sprinkler and the flow switch were corrected.
|
INSP-Sprinkler Rough-in | 12/4/2014 | 12/4/2014 | 12/9/2014 | P | FAIL |
Forrest France
|
|
|
Inspection at basement level completed - missing coverage at the storage room below north stairway per plan, obstructed coverage at the south stairway, installation does not match approved plan, mixed temps and types of heads at the woodshop area. Need to provide a plan modification for resubmittal prior to final.
|
INSP-Sprinkler Rough-in | 12/1/2014 | 12/1/2014 | 12/3/2014 | P | PART |
Forrest France
|
|
|
Verified approved plans on site. Completed inspection for the first and second floor levels. Noted three areas in need of tenting adjustments, pendent head at the master bedroom closet needs relocated, three branchlines at the great room are not yet installed (no cover until inspected), minor field modifications at the first floor to branchline routing okayed, noted heads at the first floor office are not installed in the coffered ceiling members per plan- contractor to ensure obstruction criteria are met. Partial approval only. Basement level not yet finished for inspection.
|
INSP-Sprinkler Rough-in/Hydro | 11/26/2014 | 11/26/2014 | 12/3/2014 | P | NR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 10/3/2014 | 10/6/2014 | 10/6/2014 | P | CANC |
Forrest France
|
|
|
Bldg B 3rd Floor Please call Roy 30 mins prior Phone #: ###-#### Inspection requested via web by Jacci Hunt *Inspection request intended for a different project- Wrong permit number
|
INSP-Sprinkler Rough-in | 7/22/2014 | 7/22/2014 | 7/23/2014 | P | PART |
Forrest France
|
|
|
Okay to cover UG fire supply line
|