INSP-Final Inspection | 11/13/2015 | 11/16/2015 | 11/16/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | PASS |
Troy Cobbley
|
|
|
Remaining piping is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Jim Page
|
|
|
Drop downs for new heads and upright protection inspected, See the city approved plans for locations where piping is ok to cover as marked in red. Another rough in inspection will need to be performed once ceiling grid is finished, beforeceiling tile is dropped into place.
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | FAIL |
Jim Page
|
|
|
Contractor dod not have the correct approved/stamped drawings on job site.
|
INSP-Sprinkler Rough-in | 10/1/2014 | 10/2/2014 | 10/2/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|