Permit Information
Permit NumberFIR14-00538
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 9107 W USTICK RD
Project NameVILLAGE CHATON 4 PLEX BLDG #1
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting, (4) two level apartments (townhouses). CPVC piping and extended coverage sprinklers are being utilized. The underground is 2” poly pipe. There will be a 1½” FDC.

To construct a new 3,668 sq. ft., two story, four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One-hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00288 Per Planning and Zoning. Grading Drainage and Erosion Sediment Control plans reviewed under the Grading permit BLD14-00186. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/22/20151/23/20151/23/2015PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection1/21/20151/22/20151/22/2015ACANC
DetailsTroy Cobbley
Not ready for final due to missing facp
INSP-Sprinkler Rough-in/Hydro1/21/20151/21/20151/21/2015PPASS
DetailsTroy Cobbley
Overhead hydro passed
INSP-Supply line flush1/21/20151/21/20151/21/2015PPASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in/Hydro1/20/20151/20/20151/20/2015PFAIL
DetailsTroy Cobbley
Overhead hydro test failed
INSP-Sprinkler Rough-in12/11/201412/11/201412/11/2014PPART
DetailsForrest France
Tenting inspection passed.
INSP-Sprinkler Rough-in12/9/201412/9/201412/9/2014PPASS
DetailsTroy Cobbley
Rough-in passed. No piping to be covered until a tenting inspection has been performed.
INSP-Sprinkler Rough-in12/1/201412/2/201412/2/2014ACANC
DetailsTroy Cobbley
Project not ready for inspection