INSP-Final Inspection | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/1/2014 | 12/2/2014 | 12/2/2014 | P | CANC |
Troy Cobbley
|
|
|
Richard could not make it there the same time as I was there. To be rescheduled.
|
INSP-Sprinkler Rough-in | 9/23/2014 | 9/24/2014 | 9/24/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered.
|
INSP-Supply line flush | 9/23/2014 | 9/24/2014 | 9/24/2014 | P | PASS |
Troy Cobbley
|
|
|
The underground flush passed
|
INSP-Sprinkler Rough-in | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Richard. Was scheduled for the wrong day
|
INSP-Supply line flush | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Richard. Scheduled for the wrong day
|
INSP-Sprinkler Rough-in/Hydro | 9/19/2014 | 9/22/2014 | 9/22/2014 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Richard
|
INSP-Sprinkler Rough-in | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | PASS |
Troy Cobbley
|
|
|
Remaining underground supply piping is ok to cover.
|
INSP-Sprinkler Rough-in | 8/21/2014 | 8/22/2014 | 8/22/2014 | A | FAIL |
Troy Cobbley
|
|
|
Stopped at job site but contractor needed more time to finish lowering the supply piping. He is going to reschedule for monday.
|
INSP-Sprinkler Rough-in | 8/20/2014 | 8/21/2014 | 8/21/2014 | P | FAIL |
Troy Cobbley
|
|
|
Underground from the fence to the point of connection is still not deep enough. Mr. McAlvain stated the previous finish grade will not be changed (raised) therefore the piping will need to be buried deeper.
|
INSP-Sprinkler Rough-in | 8/21/2014 | 8/21/2014 | 8/21/2014 | A | PART |
Troy Cobbley
|
|
|
Underground supply piping is ok to bury from the riser to the wrought neigbors iron fence
|
INSP-Sprinkler Rough-in | 8/20/2014 | 8/20/2014 | 8/20/2014 | P | FAIL |
Troy Cobbley
|
|
|
Left message on contacts voice mail.No contact on site. Arrived on site, no and no approved plans were available and the piping has not been installed at the minumum 4'-6" depth.
|