INSP-Final Inspection | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PASS |
Craig D. Hanson
|
|
|
Underground flow test and inspection pass
|
INSP-Sprinkler Rough-in | 10/13/2014 | 10/14/2014 | 10/14/2014 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number called in.
|
INSP-Supply line flush | 10/9/2014 | 10/9/2014 | 10/9/2014 | P | PASS |
Troy Cobbley
|
|
|
UG flush passed
|
INSP-Sprinkler Rough-in/Hydro | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Troy Cobbley
|
|
|
Undeground hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 9/5/2014 | 9/5/2014 | 9/5/2014 | P | CANC |
Troy Cobbley
|
|
|
Underground hydro flush - Troy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground piping is ok to cover. I notified Tim that the underground loop on the plans is actually 6" not 8". Actual work performed by TVFP is 8".
|