INSP-Final Inspection | 12/1/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 10/10/2014 | 10/13/2014 | 10/13/2014 | A | PASS |
Troy Cobbley
|
|
|
Tenting inspection pssed. Piping can be covered
|
INSP-Supply line flush | 10/3/2014 | 10/6/2014 | 10/6/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Supply line flush | 9/29/2014 | 9/30/2014 | 9/30/2014 | P | CANC |
Troy Cobbley
|
|
|
Not ready per Mike M is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 9/29/2014 | 9/30/2014 | 9/30/2014 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in passed. Overhead hydro passed. Piping can not be covered until a tenting inspection has been performed.
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2014 | 8/29/2014 | 8/29/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover
|