Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR14-00556
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6755 W COLEHAVEN DR
Project NameAberdeen 4-Plex:6755 Colehaven
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting a 4-unit apartment building. CPVC pipe and extended throw residential sprinklers are being utilized.

L18B2 - 6755 Colehaven - (Bldg 4) To construct a new 3,800 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms, and two bathrooms. The 1st story units are required to be Type 'B' units. All units share a common path of egress into and through a 1-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One-hour fire-partitions and one hour horizontal assemblies are required between dwelling units.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/8/20151/8/20151/8/2015PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/6/20151/7/20151/7/2015AFAIL
DetailsTroy Cobbley
Fire alarm interconnection is not functional
INSP-Final Inspection1/5/20151/6/20151/6/2015PCANC
DetailsTroy Cobbley
Cancelled due to issues on the water supply and frozen check valve.
INSP-Final Inspection12/30/201412/30/201412/30/2014PFAIL
DetailsTroy Cobbley
no water, no inspection
INSP-Sprinkler Rough-in/Hydro10/21/201410/22/201410/22/2014PPASS
DetailsCraig D. Hanson
AG hydro and rough in pass.
INSP-Supply line flush10/13/201410/14/201410/14/2014APASS
DetailsTroy Cobbley
Supply line flush passed
INSP-Sprinkler Rough-in9/12/20149/15/20149/15/2014PPART
DetailsForrest France
UG fire supply line approved for cover.