Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR14-00602
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6165 W EMERALD ST
Project NameSt. Al's Joint (JCOE)
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting a new office building with a wet pipe tree system. The branch lines are 1¼” with 3” cross main and 4” riser.

St. Alphonsus Medical Group - Medical Office Building - To construct a new 18,725 square foot, medical office building and related site improvements. The building area includes a 1,650 square foot porte-cochere. This building is constructed of a steel frame with metal studs, concrete slab floor and steel roof joists with a metal deck. The building is fully fire sprinklered. The sprinklers are used for area increase.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/24/20153/25/20153/25/2015APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection3/24/20153/26/20153/24/2015ACANC
DetailsTroy Cobbley
Mike S is your contact on site. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Final Inspection3/20/20153/24/20153/24/2015AFAIL
DetailsTroy Cobbley
No outside electric alarm bell has been installed. Flow switch comes in at the FACP as a supervisory signal. No signage on riser room door.
INSP-Supply line flush3/16/20153/18/20153/18/2015APASS
DetailsTroy Cobbley
Underground flush and forward flush test passed inspection
INSP-Supply line flush2/25/20153/2/20153/2/2015ACANC
DetailsTroy Cobbley
No underground flush performed due to United Water not having the water turned on.
INSP-Sprinkler Rough-in2/27/20153/2/20153/2/2015PCANC
DetailsTroy Cobbley
United Water has not turned on the water supply yet. No forward flush performed.
INSP-Sprinkler Rough-in/Hydro2/25/20152/26/20152/26/2015APASS
DetailsTroy Cobbley
Overhead hydro test passed. Hanger added
INSP-Sprinkler Rough-in/Hydro2/25/20152/26/20152/25/2015ACANC
DetailsTroy Cobbley
RTC/Hydro. Mike S is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro2/25/20152/26/20152/25/2015PCANC
DetailsTroy Cobbley
Mike Phone #: ###-#### Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro2/24/20152/25/20152/25/2015APART
DetailsTroy Cobbley
OH/Hydro inspection failed. Rough to cover on remaining ceilings passed. I noted one pendant needs an additional hanger.
INSP-Conference11/25/201411/25/201411/26/2014PDONE
DetailsTroy Cobbley
Mike and I discussed the location of the FDC and the control valve for the Server Room. I deferred any changes to Tim Frost for approval.