INSP-Final Inspection | 6/1/2015 | 6/2/2015 | 6/3/2015 | P | PASS |
Thomas Walsh
|
|
|
Completion of dry system 24 hour air test - PASSED. Also trip test of dry pipe valve, which measured 90 seconds to full flow at inspectors test valve. Fire alarm interface not tested this visit.
|
INSP-Sprinkler Rough-in | 6/1/2015 | 6/1/2015 | 6/1/2015 | P | CANC |
Thomas Walsh
|
|
|
24 hour air test of dry pipe valve - 40 psi @ 1330 hrs.
|
INSP-Sprinkler Rough-in | 6/1/2015 | 6/2/2015 | 6/1/2015 | P | CANC |
Thomas Walsh
|
|
|
trip test please call Leroy 30 min prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2015 | 5/21/2015 | 5/21/2015 | P | PASS |
Thomas Walsh
|
|
|
Dry pipe system hydrotest - Passed
|
INSP-Sprinkler Rough-in | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | PART |
Craig D. Hanson
|
|
|
3rd floor dry system rough in inspected and pass with as builts. 3rd floor wet system corections inspected and pass. CDH
|
INSP-Sprinkler Rough-in | 10/28/2014 | 10/29/2014 | 10/30/2014 | P | FAIL |
Forrest France
|
|
|
Inspection for Building A second floor dry system completed 10/29 PM did not pass due to several items related to coverage, spacing, and seismic bracing.
|
INSP-Sprinkler Rough-in | 10/24/2014 | 10/27/2014 | 10/27/2014 | P | CANC |
Forrest France
|
|
|
Bldg C, 1st Floor Ceiling Please call Roy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 10/22/2014 | 10/23/2014 | 10/23/2014 | A | PART |
Forrest France
|
|
|
Completed rough-in at building area B 2nd floor. Items noted include; possible light fixture obstructions at unit 201 master closet, field modifications to install at units 201 and 207, overspaced sprinkler at unit 206 bedroom, elevator lobby, mech., data, trash and hskpg rooms are not yet piped, 2" main and tie-ins at the coridor are finished. Unit 206 spacing redone while on site. Additional plan sheets for inspection purposes to match approved set and be provided with the city stamp.
|
INSP-Sprinkler Rough-in/Hydro | 10/21/2014 | 10/22/2014 | 10/22/2014 | A | DEFR |
Forrest France
|
|
|
Bldg B 2nd Floor Please call Roy 30 mins prior Phone #: ###-#### Inspection requested via web by Jacci Hunt
|
INSP-Sprinkler Rough-in | 10/6/2014 | 10/7/2014 | 10/7/2014 | A | PART |
Forrest France
|
|
|
Completed rough-in for the dry system building area A as marked/dated on approved plan. Items noted include; one seismic brace to be relocated, insufficient upright protection at one location, significant changes to main and branchline routing due to field conditions will warrant a plan modification to reflect actual installation.
|
INSP-Sprinkler Rough-in | 10/1/2014 | 10/2/2014 | 10/3/2014 | P | PART |
Forrest France
|
|
|
Verified corrections and adjustments to the dry system C wing as previously noted- Rough-in inspection completed to the masonry wall. Protection at three covered patios has been changed from DSW to DP fed from dry system.
|
INSP-Sprinkler Rough-in | 9/26/2014 | 9/29/2014 | 9/29/2014 | A | CANC |
Forrest France
|
|
|
Please call Roy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 9/23/2014 | 9/24/2014 | 9/24/2014 | P | FAIL |
Forrest France
|
|
|
Correction items noted for the remainder of dry system install at C wing include; missing hanger at 2 1/12" main, roof hatch enclosure will obstruct upright coverage, one SD attic head is overspaced, 11 ssu heads are overspaced at deck elevation change, two missing sprigs and heads at east overbuild, blocked upright at truss shear.
|
INSP-Sprinkler Rough-in | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PART |
Forrest France
|
|
|
Field verified previous correction items noted for the dry system 3rd floor building C.
|
INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 | A | FAIL |
Forrest France
|
|
|
Items noted at initial rough-in inspection for the dry system 3rd floor building C include; Missing BB3 heads at three locations, missing SD3 heads at five locations, missing seismic braces at seven locations per plan, one head per plan is shown as a SSU and is installed as a BB3, two areas shown with coverage at "hips" are not protected. Some items corrected while on site- Inspection completed 9/16 PM. Also noted minor changes to pipe routing and head locations.
|
INSP-Sprinkler Rough-in | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | PART |
Forrest France
|
|
|
Overbooked AM inspection schedule- Inspection to be continued in the afternoon per on site discussion.
|
INSP-Sprinkler Rough-in | 9/15/2014 | 9/16/2014 | 9/16/2014 | P | CANC |
Forrest France
|
|
|
Please call Roy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 9/15/2014 | 9/16/2014 | 9/15/2014 | A | CANC |
Forrest France
|
|
|
Please call Scott 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|