INSP-Final Inspection | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2015 | 4/21/2015 | 4/21/2015 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | CANC |
Troy Cobbley
|
|
|
Overbooked will need to reschedule
|
INSP-Sprinkler Rough-in/Hydro | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in/Hydro | 4/7/2015 | 4/8/2015 | 4/7/2015 | A | PASS |
Troy Cobbley
|
|
|
Tenting passed, piping ok to cover.
|
INSP-Sprinkler Rough-in | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | PASS |
Troy Cobbley
|
|
|
Tenting inspection passed. Piping can be covered. One area repaired at bathroom venting line.
|
INSP-Sprinkler Rough-in | 4/3/2015 | 4/6/2015 | 4/6/2015 | P | CANC |
Troy Cobbley
|
|
|
Overbooked
|
INSP-Sprinkler Rough-in | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | PART |
Forrest France
|
|
|
Brandon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Needs tenting inspection prior to cover of piping.
|
INSP-Sprinkler Rough-in | 2/20/2015 | 2/20/2015 | 2/20/2015 | P | CANC |
Scott Arellano
|
|
|
to cover// brandon Phone #: ###-####
Inspection cancelled per Brandon
|