Permit Information
Permit NumberFIR14-00623
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 4783 N MORNINGGALE DR
Project NameBristlegrove #7
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting a 4-unit apartment building. CPVC pipe and extended throw residential sprinklers are being utilized.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

(Bristlegrove Four-Plexes - Bldg 7) To construct a new 3,754 sq. ft., two story, four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One-hour fire-partition separations are required between dwelling units.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/24/20154/24/20154/24/2015PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro3/24/20153/24/20153/24/2015PPASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Sprinkler Rough-in/Hydro3/23/20153/23/20153/23/2015PFAIL
DetailsTroy Cobbley
Overhead hydro test failed
INSP-Sprinkler Rough-in3/19/20153/20/20153/20/2015APASS
DetailsTroy Cobbley
Tenting passed. Piping can be covered.
INSP-Supply line flush3/18/20153/19/20153/19/2015PPART
DetailsForrest France
UG fire supply line flush completed satisfactory.
INSP-Sprinkler Rough-in3/16/20153/16/20153/17/2015PPASS
DetailsTroy Cobbley
Rough-in passed. Piping can not be covered untill tenting has been passed
INSP-Sprinkler Rough-in2/18/20152/18/20152/18/2015PPASS
DetailsTroy Cobbley
Underground is ok to cover
INSP-Sprinkler Rough-in2/17/20152/17/20152/17/2015PCANC
DetailsTroy Cobbley
Underground is not ready for inspection