Information based on query as of Monday, July 15, 2024.
Permit Information
Permit NumberFIR14-00627
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 401 W FRONT ST STE Unit: 400
Project NameId Indepent Bank 4TH FLOOR TI
Customer Number 
ePlanReviewYes
Description
Quick Permit
TVFP WILL ADD 2 HEADS, RELOCATE 39 HEADS, REMOVE 10 HEADS AND MODIFY EXISTING LINES IN THE AREA OF WORK. THE NEW HEAD LAYOUT IS TO ACCOMMODATE THE REMODEL AND COMPLY WITH NFPA 13 STANDARDS. THE EXISTING EARTHQUAKE BRACING AND HANGERS WILL STAY IN PLACE AND THE NEW RELOCATED HEADS WILL BE FED FROM EXISTING OUTLETS.

(IDAHO INDEPENDENT BANK - 4TH FL IMPROVEMENTS - SUITE 400) For interior tenant improvements to an existing 6,686 sq. ft. tenant space to downsize the space to 3,985 sq. ft. creating two separate tenant spaces. Work to include the removal of interior nonbearing partition walls and construction of new interior nonbearing partiton walls to create new office spaces and small conference rooms. All work per the apprved plans and any notations. This is a fully sprinklered building; any alteraations to the building will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/29/20149/29/20149/29/2014PPASS
DetailsForrest France
Fire sprinkler permit work passed final walkthrough and inspection.
INSP-Sprinkler Rough-in9/19/20149/19/20149/19/2014PPART
DetailsForrest France
Okay to cover remainder of fire sprinkler work at the grid ceilings within the tenant remodel area.
INSP-Sprinkler Rough-in9/16/20149/17/20149/17/2014APART
DetailsForrest France
Okay to cover fire sprinkler modifications at areas marked and dated on approved plans.
INSP-Sprinkler Rough-in9/16/20149/16/20149/16/2014PPART
DetailsForrest France
Initial walkthrough and conference only- Discussed pendent and upright coverage between two new rooms.