Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberFIR14-00683
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 4032 S COUNCIL SPRING RD
Project NameTerraces of Boise Bldg J
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting skilled nursing J. Residential sprinklers, concealed space sprinklers and quick response sprinklers are being utilized. There is a dry and wet system.

The underground was installed under permit FIR14-00069

The Terraces of Boise - Skilled Nursing Cottage J - To construct a new 12,465 square foot, one story, wood framed skilled nursing facility and related site improvements. This nursing home will contain 16 sleeping units with individual restrooms, as well as, a kitchen, dining and hearth room social area. This building will also contain a hair salon, laundry, storage and mechanical areas. This building is divided into two smoke compartments by a one-hour smoke barrier wall. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/23/20159/23/20159/23/2015PPASS
DetailsThomas Walsh
Final inspection of wet and dry pipe fire sprinkler systems - PASSED.
INSP-Sprinkler Rough-in/Hydro9/22/20159/22/20159/22/2015PPART
DetailsThomas Walsh
Completion of 24 hour air test for dry- pipe system (Bldg. J) - PASSED
INSP-Final Inspection9/17/20159/21/20159/21/2015PPART
DetailsThomas Walsh
Final inspection of wet pipe and dry pipe susyems - Not Ready - DP valve currently under 24 hour air test, and a couple of heads need to be replaced (painted) and a few escutcheon rings need to be installed.
All FA interface tested OK
INSP-Sprinkler Rough-in9/17/20159/21/20159/21/2015PPART
DetailsThomas Walsh
Duplicate request - Fire sprinkler system test with fire alarm interface, including water flows, tampers, trip test of dry pipe valve, exterior bell, etc. All tested OK - trip test of DP valve exceeded 60 seconds for water to IT - Contractor stated that system met <500 gpm to not have to provide water to IT within 60 seconds. Contractor agreed to provide supporting documentation that system meets this criteria.
DP system put on 24 hour air test at 2:00pm - will retest tomorrow at same time.
INSP-Sprinkler Rough-in/Hydro9/17/20159/21/20159/21/2015PPART
DetailsThomas Walsh
Fire sprinkler system test with fire alarm interface, including water flows, tampers, trip test of dry pipe valve, exterior bell, etc. All tested OK - trip test of DP valve exceeded 60 seconds for water to IT - Contractor stated that system met <500 gpm to not have to provide water to IT within 60 seconds. Contractor agreed to provide supporting documentation that system meets this criteria.
DP system put on 24 hour air test at 2:00pm - will retest tomorrow at same time.
INSP-Sprinkler Rough-in7/24/20157/27/20157/27/2015ACANC
DetailsJim Page
Incorrect FIR number for todays inpsection, FIR number for building K to be called in by contractor, verified per conversation with onsite point of contact, Leroy, phone #: ###-####
INSP-Sprinkler Rough-in/Hydro5/18/20155/19/20155/19/2015APASS
DetailsThomas Walsh
Hydrotest of wet and dry pipe systems - no leaks noted. Pressure held for 2 hours.
INSP-Sprinkler Rough-in/Hydro5/18/20155/19/20155/18/2015PCANC
DetailsTroy Cobbley
Rough-in Hydro Wet and Dry
Please call Leroy 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Sprinkler Rough-in5/14/20155/14/20155/16/2015PPASS
DetailsThomas Walsh
Rough in inspection of Bldg. J (skilled nursing facility) wet-pipe system.
INSP-Sprinkler Rough-in/Hydro5/15/20155/15/20155/15/2015PPASS
DetailsThomas Walsh
Rough-in inspection of Bldg J - skilled nursing facility. Found 2 drips in weld connections, that will be repaired prior to hydro.; Phone #: ###-####
INSP-Sprinkler Rough-in2/4/20152/4/20152/4/2015APART
DetailsForrest France
Verification of previous C/N items for completion.
INSP-Sprinkler Rough-in2/3/20152/3/20152/3/2015APART
DetailsForrest France
Completed rough-in for the dry system building J. Items noted include; replace one CC2 sprinkler with the correct type indicated per plan, remove temp vapor barrier obstructing upright coverage above entry vestibule, two ssu exceed min separation at removed draft stop, missing coverage at one overbuild, provide verification plumbing chases meet non-combustible criteria or install sprinkler protection- ref. to plan annotations.
INSP-Sprinkler Rough-in2/2/20152/2/20152/2/2015PPART
DetailsForrest France
Rough-in at portions of the dry and wet systems only.
INSP-Sprinkler Rough-in1/16/20151/20/20151/20/2015ANR
DetailsForrest France
Bldg J dry and partial wet
Pls call Leroy 30 mins prior Phone #: ###-#### Inspection requested via web by Jacci Hunt *NR per contractor
INSP-Sprinkler Rough-in1/15/20151/16/20151/16/2015PCANC
DetailsForrest France
BLdg J dry and partial wet
Please call Leroy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt