Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberFIR14-00708
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 5301 E WARM SPRINGS AVE
Project NameTerraces of Boise EFG Wet
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting wings E, F & G. The attic in wing F is protected with concealed space sprinklers (please see figure 4 on drawing 4 for details). The above ceiling space in the main corridor of wing F is enclosed in drywall, forming a noncombustible space (please, see cross section of wing b on drawing 4 for details). Therefore, sprinklers are not required in this above ceiling space. The majority of the remaining sprinklers are residential type. Small orifice sprinklers are being utilized for closets etc. The project piping is utilizing strap hangars to the structure to comply with the seismic bracing restraint requirements of NFPA (Any piping not strapped to the structure shall require additional seismic restraints per chapter 9 of NFPA 13.) The intermediate floors are composite wood joist; these floor joist spaces shall be fire stopped into 160 ^3 spaces (see NFPA 13: 8.15.1.2.6).

The Terraces of Boise - Main Building Wings F and G - To construct a new 72,340 square foot, four story, wood framed independent living apartment building. This is a wing of a larger building, with building wings separated by two-hour firewalls. This building is being constructed on top of an underground parking garage. The parking garage is separated from the above apartment building by a three-hour horizontal separation. This building is fully fire sprinklered. The sprinklers are used for area and height increases. First Floor: 20,000 sq. ft. with 16 apartments and a design center. Second Floor: 21,000 sq. ft. with 15 apartments and a media area. Third Floor: 17,475 sq. ft. with 13 apartments and a small theater. Fourth Floor: 13,865 sq. ft. with 8 apartments units. All floors contain mechanical/electrical and housekeeping areas. Wings F and G will constructed as part of Phase II
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/14/201510/15/201510/15/2015APASS
DetailsThomas Walsh
Final Inspection passed.
INSP-Alarm Testing10/5/201510/5/201510/5/2015PPART
DetailsThomas Walsh
Test of wet-pipe systems for wings E, F & G, including all fire alarm interface testing - waterflows and tamper supervisory signals.
All floors etsted OK (within 60 seconds). The trip test of the dry pipe valve protecting the attics of these wings did not flow water within the 60 seconds time limit, therefore an accelerator will have to be installed on thsi system.
INSP-Sprinkler Rough-in/Hydro9/29/20159/30/20159/30/2015APASS
DetailsJim Page
200 psi hydrostatic test passed/complete for 3rd floor.
INSP-Sprinkler Rough-in/Hydro9/25/20159/28/20159/28/2015PPART
DetailsJim Page
200 psi hydrostatic test complete on basement level, 1st floor, 2nd floor and 4th floor. 3rd floor will need to be retested at a later date due to a leak in need of repair.
INSP-Sprinkler Rough-in9/17/20159/17/20159/17/2015PPART
DetailsThomas Walsh
Rough to cover inspection for wet-pipe systems protecting wings E, F & G - drop lid areas only (all hard lid areas previously inspected), for all floors, except wing G - 1st and 2nd floors - See plans for areas inspected - OK to cover pipe in these areas.
INSP-Sprinkler Rough-in8/3/20158/4/20158/4/2015APART
DetailsThomas Walsh
RTC inspection for hard lids in Bldg G- 1st, 2nd, 3rd floors. See plans for areas inspected today. OK to cover these areas.
INSP-Sprinkler Rough-in7/17/20157/20/20157/20/2015APART
DetailsThomas Walsh
RTC inspection for portion of Bldg. F - 4th floor that was previously sheetrocked prior to inspection - 4 heads total, and the 1st floor corridor of Bldg. F.
OK to cover pipe in these areas.
INSP-Sprinkler Rough-in7/16/20157/17/20157/17/2015APART
DetailsThomas Walsh
RTC wet // Bldg. E - 1st floor, Bldg. F - 2nd, 3rd and 4th floor hard lid corridors and comon rooms off the corridors.
NOTE: 4th floor Bldg F had some rooms that were already covered, so could not inspect these areas. Some sheetrock in these rooms will have to be removed to complete inspection of these rooms. See plans for areas inspected and OK to cover for this visit.
INSP-Sprinkler Rough-in5/6/20155/6/20155/6/2015PPART
DetailsScott Arellano
Area "E" 2nd floor corridors OK to cover.
INSP-Sprinkler Rough-in4/29/20154/29/20154/29/2015PPART
DetailsKatie Marron
Hard lids only at 3rd floor hallway and common room ok to cover. Advised that current drops for drop ceiling areas look overspaced, contractor to adjust as needed before RTC for drop ceiling. Storage room by elevator still pending a sprinkler drop.
INSP-Sprinkler Rough-in4/22/20154/22/20154/22/2015PPART
DetailsKatie Marron
Bldg G 1st and 2nd Floor dwelling units only ok to cover. One room on both floors missing a head per plan, verified existing coverage is sufficient. Additional heads (1 each) found (not on plan) to end rooms on 1st floor, OK'd. Additional head added in one room, both floors, to maintain coverage from door header, Ok'd.
INSP-Sprinkler Rough-in/Hydro4/22/20154/22/20154/22/2015PCANC
DetailsTroy Cobbley
Bldg G 1st and 2nd floor RTC
Please call Leroy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Sprinkler Rough-in4/15/20154/15/20154/15/2015PFAIL
DetailsKatie Marron
Bldg G wet system 2nd Floor
, no approval for cover at this time due to significant field modifications, requiring plan resubmittial. Modifications include changes to remote area.
INSP-Sprinkler Rough-in3/19/20153/20/20153/20/2015APART
DetailsForrest France
Overhead inspection for the 3rd floor area G wet system at living units only, including tenting, okayed per as-built plans matching install with the exception of two balconies now covered by dry system.
INSP-Sprinkler Rough-in3/19/20153/19/20153/19/2015PCANC
DetailsForrest France
3rd floor rough to cover .
Please call Leroy 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Sprinkler Rough-in3/2/20153/3/20153/6/2015PPART
DetailsForrest France
INSP-Sprinkler Rough-in2/20/20152/20/20152/20/2015PPART
DetailsForrest France
Area F 1st floor living units passed rough-in inspection.
INSP-Sprinkler Rough-in2/18/20152/18/20152/19/2015PPART
DetailsForrest France
Rough-in inspection for the 4th floor area F living units completed.
INSP-Sprinkler Rough-in2/9/20152/9/20152/9/2015PPART
DetailsForrest France
Rough-in inspection completed for building area F 3rd floor wet system living units only- Main at corridor is not yet installed. As-built drawings verified on site to match installation. Items noted corrected while on site.
INSP-Sprinkler Rough-in1/28/20151/29/20151/29/2015APART
DetailsForrest France
Rough-in inspection completed for the 1st floor area E living units. Record drawings provided to match field work and retained to verify with plan resubmittal as previously agreed.
INSP-Sprinkler Rough-in1/27/20151/28/20151/27/2015PCANC
DetailsForrest France
3rd floor balcony RTC
Call Leroy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Sprinkler Rough-in/Hydro1/16/20151/16/20151/16/2015APART
DetailsForrest France
Cover inspection for 3rd and 2nd floor E wing wet system at living units only- Completed with reviewed as-builts to match field installation per agreement. Need to adjust tenting at the 2" main 3rd floor NW end, noted three branchlines 2nd floor which do not correlate to the actual install. Okayed for 3rd floor cover, 2nd okayed pending accurate drawings.
INSP-Sprinkler Rough-in1/9/20151/12/20151/12/2015ANR
DetailsForrest France
Bldg E 2nd and 3rd Floor
Pls call Leroy 30 mins prior Phone #: ###-#### Inspection requested via web by Jacci Hunt
INSP-Sprinkler Rough-in1/8/20151/8/20151/9/2015PFAIL
DetailsForrest France
Conditions unchanged. Refer to inspection notes dated 1/2/15.
INSP-Sprinkler Rough-in1/7/20151/8/20151/9/2015AFAIL
DetailsForrest France
Conditions unchanged. Refer to inspection notes dated 1/2/15.
INSP-Sprinkler Rough-in12/30/20141/2/20151/2/2015AFAIL
DetailsForrest France
Field installation does not match approved drawings. Noted changes to branchlines, number of sprinklers, and head layout compared to the design. - Inspection area wing E third floor.
INSP-Sprinkler Rough-in12/30/201412/31/201412/31/2014PDEFR
DetailsForrest France
INSP-Sprinkler Rough-in2/10/20152/10/2015 P 
DetailsForrest France
Rough to cover 2nd floor F. ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Carter II
INSP-Sprinkler Rough-in11/26/201411/26/2014 P 
DetailsForrest France
Matt Phone #: ###-####